Link Ipl Ports On 3746-900; Ipl And Loading The Network Control Program - IBM 3745 Connection And Integration Manual

Communication controller, nways multiprotocol controller
Table of Contents

Advertisement

Step

Link IPL Ports on 3746-900.

3746-900
Up to microcode EC D22513, to use an ESCON channel as an IPL port:
1. Click on Configuration Management in the MOSS-E menu
2. Double-click on Manage ESCON Processors.
From microcode EC D22560, when the APPN feature is not installed, to use an
ESCON channel as an IPL port:
1. Click on Configuration Management in the MOSS-E menu
2. Double-click on Configure ESCON Processors.
3746-900NN and 3746-900IP
From microcode EC D22560, when the APPN feature is installed, to use an
ESCON channel as an IPL port:
1. Click on Network Node Processor Management in the 3746-9x0 menu
2. Double-click on Controller Configuration and Management
Note: In all above cases, Manage ESCON Processors is still valid for display

IPL and Loading the Network Control Program

This procedure explains how to IPL the CCU(s) and load the control program
(NCP) into the 3745.
Note: To perform this procedure on the 3746-900 you must use MOSS-E
functions. Refer to the Basic Operations Guide, SA33-0177.
Step
Step
Step
5-18
3745 All Models & 3746-900: CIG
8
.
You must perform an IPL for these changes to take effect. You can
either:
Perform an IPL (see page 5-18)
Continue with other integration procedures and perform an IPL later
on.
You have finished this procedure.
Note: You must at least do "Saving MOSS from Fixed Disk onto
Diskettes" on page 5-19 when you have finished all other
integration procedures.
purpose.
1
2
If you have a dual CCU controller:
or
or
Otherwise, continue with the next step.
3
or
then
If you are loading the control program from the 3745 fixed disk (using
the MOSS DII function), go to Step 6 on page 5-19.
then
or
then

Advertisement

Table of Contents
loading

This manual is also suitable for:

3745 a3746-9003746-900nn3746-900ip

Table of Contents