8. Tighten loose screws before proceeding.
9. Remove the desiccant bags delivered together with the system and dispose of
them according to your country's legislation.
The Centellis 2000 is thoroughly inspected before shipment. If any damage occurred during
transportation or any items are missing, please contact our customer's service immediately.
2.2.2

Site and Installation Planning

Planning basic site and installation requirements you have to consider the following:
Adequate power should be available for the Centellis 2000 system
For AC, the system should be positioned in a way that 100 VAC to 240 VAC power source is
easy to reach
For DC, the system should be positioned in a way that -48 VDC to -60 VDC power source is
easy to reach
There should be sufficient space in racks to install the system
Suitable equipment should be available to lift the system into the rack
There should be enough space to run a system console terminal (only if you want to use a
local terminal). The cable should be long enough to reach the system.
There should be a inlet and outlet of the fans and therefore the airflow is not blocked
For Installation in restricted access location
For use by trained personnel
2.3

Requirements

Before and during system installation and operation, you always have to ensure that the
requirements listed in the following sections are met.