Site Preparation; Overview; Site Planning Considerations - Emerson Centellis 2000 Shelf Release 3.0 Manual

Table of Contents

Advertisement

Site Preparation

2.1

Overview

The following sections help you to prepare system installation:
Section
Site Planning Considerations on page 41
Requirements on page 43
Dimensions and Weight on page 48
Mounting Options on page 48
Cooling Considerations on page 50
Acoustic Noise Control on page 51
2.2

Site Planning Considerations

This section provides information to prepare the site and the shelf for installation.
Centellis 2000 Shelf Release 3.0 Installation and Use (6806800L99F)
Gives Information On
This section includes information on unpacking and
inspecting the system, requirements, technical data, and
other information you need to know before you start
system installation.
This section lists requirements which must be fulfilled
when operating the system.
This section lists the dimensions and weight of the shelf
and system components.
This section includes information on mounting the
system.
This section includes information on the cooling system.
This section includes information on acoustic noise
control.
Chapter 2
41

Advertisement

Table of Contents
loading

Table of Contents