Ac System Startup Procedure - Emerson Centellis 2000 Shelf Release 3.0 Manual

Table of Contents

Advertisement

The following sections describes the startup procedure for Centellis 2000 AC and Centellis
2000 DC systems.
3.3.3.1

AC System Startup Procedure

Depending on the system configuration, the actual powering up may take up to 3 minutes.
Make sure that the system has been placed in a location at room temperature for at least
24 hours before powering it up.
1. Put on an ESD wrist strap.
2. Connect the strap to the shelf by attaching the front or rear ESD jack/ESD snap.
3. Mount the grounding cable to the Protective Earth connection lug if not done
already.
4. Make sure that the external power feeds you plan to attach are powered off and
cannot be switched on while you are working.
5. Connect the AC International Electric Code (IEC) wired connector to the AC power
supplies.
Product Damage
Improper cabling damages your product.
Take extreme care not to connect the power cable in reverse polarity.
Centellis 2000 Shelf Release 3.0 Installation and Use (6806800L99F)
System Installation
61

Advertisement

Table of Contents
loading

Table of Contents