Chapter 2 Unpacking And Installation; Overview; Pre-Inspection; Unpacking - CPI T04CO Installation & Operation Manual

Mpa hub mount
Table of Contents

Advertisement

UNPACKING AND INSTALLATION

2.1 Overview

This chapter contains instructions for unpacking and installing the
MPA Hub Mount.

2.2 Pre-Inspection

Inspect the exterior of the shipping container(s) for evidence of
damage in shipment. If damage is evident, immediately contact the
carrier that delivered the equipment and submit a damage report.
Failure to do so could invalidate future claims.

2.3 Unpacking

Carefully unpack and remove all items from the shipping
container(s). Inspect the interior of the container for damage. Save
all packing material until all inspections are complete. It is
recommended that all packing material be saved for potential
future use. Verify that all items listed on the packing slips have
been received.
Inspect all items for evidence of damage in shipment. If damage
seems evident, immediately contact the carrier that delivered the
equipment and file a claim. Failure to do so could invalidate future
claims.
Doc. 01031254 Rev. 1
Chapter 2
M P A H U B M O U N T
2-1

Advertisement

Table of Contents
loading

This manual is also suitable for:

T04uo

Table of Contents