Download Print this page

Additional Materials; Optional Materials - Heartland VALUE Series Assembly Manual

Hide thumbs Also See for VALUE Series:

Advertisement

Required
Phillips
Utility Knife
Screwdriver
Shingle Blades
Drill / Driver
3/8" Drill Bit
Caulk Gun
#2 Philips Drive Bit
Hammer
Paint Tools
Level
Safety Glasses
Pencil
Ladder
Tape Measure
Square
Safety! Always use approved safety glasses during assembly.
HELPFUL REMINDER SYMBOLS
Look for these symbols for helpful reminders throughout this manual.
= Assistance Required; two or more people.
= Ensure squareness.
= Important required step or operation.
= Helpful assembly hint.
ORIENT LUMBER AND TRIM FOR BEST APPEARANCE
Framing lumber is graded for structural strength and not appearance. Exterior trim is graded for one good side.
Always install the material leaving the best edge and best surface visible. Please remember that these blemishes in no way
negatively affect the strength or integrity of our product. (See Fig. A, B, C.)
A
TOOLS
Optional
Tool Belt/
Nail Pouch
Tin Snips
(for drip edge)
Chalk Line
Nail Gun
• gun nails
Gloves
= Mark part with pencil.
= Beginning of steps for assembly or installation.
BEGIN
FINISH
= You have finished the assembly or installation.
= Level
B
C
2

ADDITIONAL MATERIALS

FOUNDATION OR FLOOR MATERIALS
• This shed kit includes a complete wood fl oor frame system. It does not include floor panels.
• It does not include ANY leveling materials.
See the FLOOR LEVELING section on page 8 for recommended methods and suggested materials to properly level your
fl oor, as this will vary depending on your specifi c site.
REINFORCED WOOD FLOOR FRAME (OPTIONAL)
IMPORTANT!
The included fl
fi c use you may want to construct a
fl oor frame by adding additional fl
x1
2 x 4 x 10' (5 x 10 x 305 cm) Treated Lumber
Cut to (5) 2 x 4 x 21" (5 x 10 x 53,3 cm)
x5
2 x 4 x 8' (5 x 10 x 244 cm) Tr e ated Lumber
Cut to (5) 2 x 4 x 89-1/2" (5 x 10 x 227 cm)
x40
ea. 3" (7,6 cm) Hot Dipped Galvanized Nails
FLOOR PANELS (NOT INCLUDED)
x2
3/4 x 48 x 92-5/8"
(1,9 x 113 x 235 cm)
3/4 x 23-7/8 x 96"
x1
(1,9 x 61 x 244 cm)
COMPLETING YOUR SHED
You will need these additional materials:
3-TAB SHINGLES ............................ 6 Bundle s
PAINT FOR SIDING .......................... 2 Gallons
Use 100% acrylic latex exterior paint. (2) coats r ecommended.
CAULK ................................................. 3 Tube s
Use acrylic latex exterior caulk that is paintable.

OPTIONAL MATERIALS

DRIP EDGE ..................... 30 Feet
REFER TO THE BACK OF THIS MANUAL AND THE MANUFACTURER'S INSTRUCTIONS
FOR INSTALLATION OF SHINGLES, DRIP EDGE AND FELT.
Optional 12" (30,5 cm) spacing
Standard 24" (61 cm) spacing
Floor Panels are all 3/4" (1,9 cm) thick.
x1
3/4 x 23-7/8 x 23-7/8"
(1,9 x 61 x 61cm)
3/4 x 23-7/8 x 92-5/8"
x1
(1,9 x 61 x 235 cm)
1" GALVANIZED ROOFING NAILS.... 3 Lb
For shingles.
PAINT FOR TRIM .............................1 Quart
Use 100% acrylic latex exterior paint.
WOOD GLUE ....................... Exterior Rated
#15 ROOFING FELT
To cover 145 Sq. Ft. of roof area.
1" GALVANIZED ROOFING NAILS.........1/4 Lb
For rooÞ ng felt.
3
s

Advertisement

loading