Download Print this page

Heartland VALUE Series Assembly Manual page 13

Hide thumbs Also See for VALUE Series:

Advertisement

WING WALL PANELS
PARTS REQUIRED:
x2
LEFT
x2
RIGHT
x4
OB
2 x 3 x 72-5/8" (5 x 7,6 x 184,5 cm)
BEGIN
1
You will assemble TWO RIGHT and TWO LEFT wing walls.
2
Place OB on floor.
Place a wing wall panel primed side down onto OB (Fig.A).
3
Secure flush to edges using eight 1-1/4 screws 10" apart.
You have finished building two sets of wing wall assemblies. Set and aside.
Continue building your back wall.
10" (25,4 cm)
Approximately
x2
Use 2x3's
for support.
x2
1-1/4" (3 cm) x32
Fig A.
Primed Side
Down.
2-1/2"
(6,35 cm)
Flush
2-1/2"
(6,35 cm)
Flush
20
PARTS REQUIRED:
x1
LEFT
RIGHT
x1
5
Place wing wall assemblies onto frame with top of panels flush (Fig.A).
6
Nail left and right wing wall assemblies onto back wall frame
using 2" nails 6" apart.
FINISH
7
You have finished attaching your wing walls.
LEFT
OB
BACK WALL
Pre-assembled
Pre-assembled
Do not nail
in groove.
Primed side
UP
HINT:
To draw panels tight at
seams angle nail.
21
2" (5 cm) x34
Flush
Fig A.
RIGHT
6" (15 cm)
Use 2x3
for support.

Advertisement

loading

Related Products for Heartland VALUE Series