Download Print this page

Heartland VALUE Series Assembly Manual page 17

Hide thumbs Also See for VALUE Series:

Advertisement

FRONT GABLE PANELS AND TRIM
PARTS REQUIRED:
x4
PD
2 x 3 x 45-1/8" (5 x 7,6 x 115 cm)
x1
Check panels
LEFT
LIP
have these
EDGE
Edge painted
edges.
green.
1
You will be attaching trim PD from the backside of the gable panels (Fig. A).
You will assemble a RIGHT and a LEFT assembly.
2
Place trim PD on floor.
Orient red ends as shown.
3
Place a left or right gable panel onto trim primed side down
(Fig.A).
Verify the square and lip edges.
4
Locate trim PD flush to edges and secure with six 1-1/4" screws 11" apart.
FINISH
You have finished building the front gable panel assemblies.
5
Continue building your frontwall.
RED END of PD
Flush
PD
Look for edge
painted red.
Primed side is down.
Use a 2x3
on flat for
support.
x1
RIGHT
SQUARE
EDGE
Edge painted
red.
PRIMED SIDE
DOWN.
IMPORTANT!
Fig. A
Flush
11" (28 cm)
PD
Approximately
Look for edge
painted green.
28
PARTS REQUIRED:
x1
1-1/4" (3 cm) x24
CO
x1
Pre-assembled
Center CO on edge onto wall frame and
1
secure using two 3" screws (Fig. A).
2
Place the left gable panel onto wall frame
primed side up and onto CO.
Make sure lip of panel lines up with groove
of panel below (Fig B).
Nail with 2" nails 6" apart.
3
Place right gable panel onto wall frame primed side
up and onto CO and flush to left gable panel.
Nail with 2" nails 6" apart.
FINISH
You have finished building your frontwall.
4
Carefully flip the frontwall off the floor.
FRONT WALL GABLE PANELS
2 x 3 x 25" (5 x 7,6 x 63,5 cm)
LEFT
RIGHT
x1
Pre-assembled
1-1/2"
(3,8 cm)
48-3/4"
(124 cm)
Flush
6" (15 cm)
29
2" (5 cm) x24
3" (7,6 cm) x2
CO
CO
48-3/4"
(124 cm)
Screws 3"
(7,6 cm)
Flush
Fig. A
LEFT
Fig. B
Line up
grooves.
3/8"
Edge of
0,9 cm
groove.
Flush
RIGHT
Flush
6"
(15 cm)

Advertisement

loading

Related Products for Heartland VALUE Series