16196-A
STOP!
STOP!
Call Us First!
DO NOT RETURN TO STORE.
For immediate help with assembly or product information
call our toll free number:
1-800-827-9056
or email:
customerservice@backyardproductsllc.com
Our staff is ready to provide assistance
April through October M-F 8:00 AM to 4:30 PM EST
Saturday 8:30 AM to 4:30 PM EST
November through March M - F 8:00 AM to 5:00 PM EST

Advertisement

loading

Summary of Contents for Heartland VALUE Series

  • Page 1 16196-A STOP! STOP! Call Us First! DO NOT RETURN TO STORE. For immediate help with assembly or product information call our toll free number: 1-800-827-9056 or email: customerservice@backyardproductsllc.com Our staff is ready to provide assistance April through October M-F 8:00 AM to 4:30 PM EST Saturday 8:30 AM to 4:30 PM EST November through March M - F 8:00 AM to 5:00 PM EST...
  • Page 2 (This page is intentionally left blank.)
  • Page 3: Assembly Manual

    16196-A 04/19/2021 ASSEMBLY MANUAL VALUE SERIES SOHO MODERN 12' x 7' -6" (365,8 x 228,6 cm) ACTUAL FLOOR SIZE IS 144" x 90" (365,8 x 228,6 cm) KEEP THIS MANUAL FOR FUTURE REFERENCE IMPORTAN T ! READ INSTRUCTIONS THOROUGHLY PRIOR TO BEGINNING ASSEMBLY BEFORE YOU BEGIN •...
  • Page 4 TOOLS Required Optional Phillips Tool Belt/ Utility Knife Screwdriver Nail Pouch Shingle Blades Drill / Driver Tin Snips 1/4" Drill Bit (for drip edge) Caulk Gun 3/8" Drill Bit 1/2" Drill Bit Pliers #2 Philips Drive Bit Paint Tools Hammer Chalk Line Level Safety Glasses...
  • Page 5 ADDITIONAL MATERIALS FOR BUILDING YOUR SHED 3-TAB SHINGLES ......5 Bundles 1" GALVANIZED ROOFING NAILS..3 Lbs For shingles. PAINT FOR SIDING ......2 Gallons PAINT FOR TRIM ......1 Quart Use 100% acrylic latex exterior paint. Use 100% acrylic latex exterior paint. (2) coats recommended. 1"...
  • Page 6: Parts List

    PARTS IDENTIFICATION AND SIZES Part identification WOOD SIZE CONVERSION CHART letters are stamped on some parts. Treated lumber is stamped: Nominal Board Size Actual Size 2 x 4 ....1-1/2" x 3-1/2" (3,8 x 8,9 cm) 1 x 4 ....3/4" x 3-1/2" (1,9 x 8,9 cm) 2 x 3 ....1-1/2"...
  • Page 7 PARTS LIST continued... 19/32" x 3-1/2" x 45" (1,5 x 8,8 x 114,3 cm) 19/32" x 2-1/2" x 58-3/4" (1,5 x 6,3 x 149,2 cm) 19/32" x 3-1/2" x 59-1/4" (1,5 x 8,8 x 150,4 cm) 19/32" x 3-1/2" x 60-1/2" (1,5 x 8,8 x 153,7 cm) 19/32"...
  • Page 8 WALL PANEL & DOORS PARTS LIST 3/8" x 10-7/16" x 48" (1 x 26,5 x 121,9 cm) 3/8" x 4-1/2" x 48" 3/8" x 48 x 76" 3/8" x 48" x 84" 3/8" x 48" x 84" (1 x 11,4 x 121,9 cm) (1 x 113,3 x 193 cm) (1 x 122 x 213,4 cm) (1 x 122 x 213,4 cm)
  • Page 9: Door Hardware

    HARDWARE / WINDOWS / Misc. H 2.5 Tie Plate 1/2" (1,2 cm) 8 x 16" Window (20,3 x 35,6 cm) DOOR HARDWARE Spring Bolt 1-1/2" (3,8 cm) 1-1/4" (3,2 cm) 3/4" (1,9 cm) x11 64" Metal Threshold Bagged separately / special coating NOTES...
  • Page 10 FLOOR LEVELING OPTIONS There are multiple ways to level your floor frame. Our recommended leveling method is shown below. Leveling materials are not included in this kit. PREFERRED METHOD - 4x4 TREATED RUNNERS • 3" Screws angled into 4x4. • (2) at each point frame •...
  • Page 11 CONCRETE FOUNDATION Your kit contains all materials to construct a wooden floor. If you choose to install your kit on a concrete slab refer to the diagram below. Treated Sill Plate Caulk between sill plate and concrete. 3-1/2" (8,9 cm) 4"...
  • Page 12: Parts Required

    FLOOR FRAME (NOT INCLUDED) PARTS REQUIRED: 3" (7,6 cm) 2 x 4 x 87" (5,1 x 10,2 x 221 cm) Look for TREATED 2 x 4 x 144" (5,1 x 10,2 x 365,8 cm) Stamp BEGIN Orient parts as shown on fl at surface. Measure and mark. HINT: For easier nailing Secure with (2) 3"...
  • Page 13 LEVEL AND SQUARE FLOOR FRAME Before installing fl oor decking, it is important to level and square the fl oor frame. A level and square fl oor frame is required to correctly construct your shed. BEGIN See page 8 for the preferred fl oor leveling method. Use level and check the frame is level before applying fl oor panels.
  • Page 14 FLOOR PANELS PARTS REQUIRED: 2" (5,1 cm) 5/8" x 48" x 96" (1,6 x 121,9 x 243,8 cm) Install all panels with the rough side facing up (painted grid lines). BEGIN Install the 48" x 96" panel with the 48" edge and corner fl ush to the fl oor frame (Fig A). Secure panel with (2) 2"...
  • Page 15 FLOOR PANELS PARTS REQUIRED: x115 2" (5,1 cm) 5/8" x 42" x 96" 5/8" x 48" x 90" (1,6 x 106,7 x 243,8 cm) (1,6 x 60,6 x 122 cm) Continue installing panels with 2" nails spaced 6" apart on edges, and 12" apart inside panels. Flush 6"...
  • Page 16 IMPORTANT! Check the floor frame is level after installing floor panels. Re-level if needed. • The floor should be used as a stable work surface for wall construction. • Organize your assembly procedure during the build process HINT: to avoid over-handling of the walls. Back Wall Front Wall...
  • Page 17 BACK WALL FRAME PARTS REQUIRED: 3" (7,6 cm) 2 x 4 x 48" (5,1 x 10,2 x 121,9 cm) 2 x 4 x 68" (5,1 x 10,2 x 172,7 cm) 2 x 4 x 96" (5,1 x 10,2 x 243,8 cm) BEGIN Orient parts on edge on floor.
  • Page 18 BACK WALL PANELS PARTS REQUIRED: 2" (5,1 cm) 3/4" GAUGE 48" x 76" BLOCK (121,9 x 193 cm) Install all panels with the primed side facing up. • Ensure top of panel is overhanging the top of frame by 4". Place 48"...
  • Page 19 BACK WALL PANELS PARTS REQUIRED: 2" (5,1 cm) 3/4" GAUGE BLOCK 48" x 76" (121,9 x 193 cm) Place center and end 48" x 76" panels For squareness maintain 3/4" measurement along panel edges. on frame as shown (Fig. A, Fig. B). Flush 4"...
  • Page 20 FRONT WALL - DOOR HEADER PARTS REQUIRED: 3" (7,6 cm) 7/16" x 3-1/4" x 66-3/4" (1,1 x 8,3 x 169,5 cm) 2" (5,1 cm) 2 x 4 x 67" (5,1 x 10,2 x 170,2 cm) BEGIN Build header assembly as shown using 3" and 2" nails. Flush 3"...
  • Page 21 FRONT WALL FRAME PARTS REQUIRED: 3" (7,6 cm) 2 x 4 x 40" (5,1 x 10,2 x 101,6 cm) 2 x 4 x 70-1/2" (5,1 x 10,2 x 179,1 cm) 2 x 4 x 12-1/8" (5,1 x 10,2 x 30,8 cm) 2 x 4 x 72"...
  • Page 22 FRONT WALL FRAME PARTS REQUIRED: Pre-Assembled Door Header 3" (7,6 cm) 4" x 67" (170,2 cm) 2 x 4 x 68-9/16" (5,1 x 10,2 x 174,1 cm) Install door header with OSB to the top of header. Secure header with 3" nails at locations shown. Orient parts NCE on edge as shown.
  • Page 23 FRONT WALL PANELS PARTS REQUIRED: 2" (5,1 cm) 3/8" x 48" x 96" (1 x 121,9 x 243,8 cm) Install all panels with the primed side facing up. Handle panels with care to avoid breakage. BEGIN Install first 48" x 96" panel 5-7/8" above top plate. Secure panel with 2"...
  • Page 24 FRONT WALL PANELS PARTS REQUIRED: 2" (5,1 cm) 3/8" x 1-1/2" x 9" (1 x 3,8 x 22,9 cm) 3/8" x 4-1/2" x 48" 3/8" x 10-7/16" x 48" (1 x 11,4 x 121,9 cm) (1 x 26,5 x 121,9 cm) Install panels in the following order: 1.
  • Page 25 FRONT WALL PANELS PARTS REQUIRED: 3" (7,6 cm) 2" (5,1 cm) Temporary Brace 2 x 3 x 72" (5,1 x 7,6 x 182,8 cm) 3/8" x 48" x 96" (1 x 121,9 x 243,8 cm) Install 2nd 48" x 96" panel fl ush to frame as shown and 5-7/8" from the top. Secure panel using 2"...
  • Page 26: Back Wall Installation

    BACK WALL INSTALLATION PARTS REQUIRED: 3" (7,6 cm) TEMPORARY 2 x 3 x 59-1/4" (5,1 x 7,6 x 150,5 cm) 3" (7,6 cm) 2" (5,1 cm) BEGIN Center back wall assembly on the 144" fl oor dimension. Note: The 4" wall overhang is installed to the top. 4"...
  • Page 27 FRONT WALL INSTALLATION PARTS REQUIRED 3" (7,6 cm) TEMPORARY 2 x 4 x 78-1/16" (5,1 x 10,2 x 198,3 cm) 3" (7,6 cm) 2" (5,1 cm) BEGIN Center front wall assembly on the 144" front fl oor dimension. Use (2) OFB as temporary braces. Level wall and secure OFB with 3"...
  • Page 28 DOUBLER INSTALLATION PARTS REQUIRED: 3" (7,6 cm) 2 x 4 x 48" (5,1 x 10,2 x 122 cm) 2 x 4 x 96" (5,1 x 10,2 x 243,8 cm) BEGIN Center doublers SP and TP on back wall top plate. Secure with 3"...
  • Page 29 OUTER RAFTER INSTALLATION PARTS REQUIRED: 3" (7,6 cm) 2 x 4 x 92-3/16" (5,1 x 10,2 x 234,2 cm) 2" (5,1 cm) BEGIN Install rafters on front and back wall doublers. Ensure rafters are fl ush to end of top plates (Fig. B, Fig. D). Secure rafters as shown in all Figures.
  • Page 30 OUTER RAFTER INSTALLATION PARTS REQUIRED: H 2.5 Tie Plate 1-1/2" (3,8 cm) Fasten tie plates with 1-1/2" nails as shown. 1-1/2" (3,8 cm) Nails FINISH Your outer rafters are now installed.
  • Page 31 RAFTERS PARTS REQUIRED: 3" (7,6 cm) 2 x 4 x 92-3/16" (5,1 x 10,2 x 234,2 cm) 2" (5,1 cm) BEGIN Measure and mark location of each rafter. Note the door location. Center rafters on marks. Secure rafters with 2" screws installed centered into outer rafter ends (Fig. A). Continue securing rafters with 3"...
  • Page 32 RAFTERS PARTS REQUIRED: H 2.5 Tie Plate 1-1/2" (3,8 cm) Install (9) tie plates with 1-1/2" nails as shown (Fig. A). Fig. A 1-1/2" (3,8 cm) Nails FINISH Your rafters are now installed.
  • Page 33 SIDE WALL PANELS PARTS REQUIRED: 3" (7,6 cm) TEMPORARY SUPPORT 69" (75,3 cm) Door Stiffener 2" (5,1 cm) 1-1/2" (3,8 cm) 3/8" x 42" x 96" 3/8" x 42" x 96" 3/8" x 48" x 84" 3/8" x 48" x 84" (1 x 106,7 x 243,8 cm) (1 x 106,7 x 243,8 cm) (1 x 121,9 x 213,4 cm)
  • Page 34 SIDE WALL PANELS PARTS REQUIRED: 1-1/2" (3,8 cm) 2" (5,1 cm) Place 48" x 84" panel on side wall flush with bottom of installed 42" x 96" panel. Secure panel with (1) 2" nail in bottom corner (Fig. C). Ensure the measurement between the panel edges are the same along the corner (Fig.
  • Page 35 SIDE WALL STUDS PARTS REQUIRED: 3" (7,6 cm) 2 x 4 x 78-1/16" (5,1 x 10,2 x 198,3 cm) 2 x 4 x 82-1/2" (5,1 x 10,2 x 209,6 cm) 2 x 4 x 86-15/16" (5,1 x 10,2 x 220,8 cm) BEGIN Install NES centered at seam of side wall panels (Fig A).
  • Page 36 SIDE WALL PANELS PARTS REQUIRED: 1-1/2" (3,8 cm) (Left / Green) (Right / Red) 3/8" x 2-11/16" x 12-1/4" (1,5 x 6,8 x 31,1 cm) 3/8" x 2-11/16" x 12-1/4" (1,5 x 6,8 x 31,1 cm) BEGIN Install 2-11/16" x 12-1/4" triangular fi ller panel using (2) 1-1/2" nails. Flush fi ller panel to installed panels (Red for right side) as shown.
  • Page 37 ROOF PANELS PARTS REQUIRED: 2" (5,1 cm) 7/16 x 10-11/16 x 28" (1,1 x 27,1 x 71,1 cm) 7/16 x 10-11/16 x 96" 3/4" GAUGE (1,1 x 27,1 x 243,8 cm) 7/16 x 10-11/16 x 31-7/8" BLOCK (1,1 x 27,1 x 81 cm) Install all roof panels with the rough side facing up.
  • Page 38 ROOF PANELS PARTS REQUIRED: 2" (5,1 cm) 3/4" GAUGE 7/16" x 48 x 96" BLOCK (1,1 x 121,9 x 243,8 cm) Square the roof by installing one 48" x 96" panel at this time. Use the panel's long edge as a lever to bring your roof into square. Place the 48"...
  • Page 39 ROOF PANELS PARTS REQUIRED: 2" (5,1 cm) 3/4" GAUGE 7/16" x 48" x 96" BLOCK 7/16" x 11-7/8" x 96" (1,1 x 121,9 x 243,8 cm) (1,1 x 30,2 x 243,8 cm) Install 2nd 48"x 96" panel flush to installed panels. Maintain 3/4"...
  • Page 40 ROOF PANELS PARTS REQUIRED: x148 2" (5,1 cm) Complete the securing of all upper roof panels with 2" nails spaced 6" along edge and 12" inside panel. 6" (15,2 cm) FINISH Your roof panels are now installed.
  • Page 41 RAFTER EXTENSIONS PARTS REQUIRED: 2" (5,1 cm) 2 x 3 x 10-7/16" (5,1 x 7,6 x 26,5 cm) BEGIN Line up each rafter extension QVA 90 degrees square with rafters as shown. Secure rafter extensions with 2" screws through roof panels (Fig. A). Secure with (4) screws at roof panel seams.
  • Page 42 SIDE RAKE FRAMING PARTS REQUIRED: 2" (5,1 cm) 1 x 3 x 31-15/16" (2,5 x 7,6 x 81,1 cm) 1 x 3 x 72" (2,5 x 7,6 x 182,8 cm) BEGIN Align THB edge fl ush with rafter extension (Fig A). Secure with (3) 2" nails (Fig B). Install HJ fl ush to THB and secure with (5) 2"...
  • Page 43 SIDE SOFFIT PARTS REQUIRED: 2" (5,1 cm) 3/8" x 5-1/4" x 94-7/16" (1 x 13,3 x 242,5 cm) BEGIN Install 94-7/16" soffi t primed side down fl ush to front wall panel (Fig. A). Secure to side rake frame THB with (7) 2" fi nish nails (Fig. A, B). Fig.
  • Page 44 FRONT SOFFIT PARTS REQUIRED: 2" (5,1 cm) 3/8" x 10-3/8" x 75-5/8" (1 x 26,3 x 191,2 cm) 3/8" x 10-3/8" x 79-5/8" (1 x 26,3 x 202,2 cm) BEGIN Install 75-5/8" and 79-5/8" soffi t panel primed side out under rafter extensions and fl ush to side wall soffi t (Fig.
  • Page 45: Front Wall

    FRONT FASCIA TRIM PARTS REQUIRED: 2" (5,1 cm) 19/32" x 3-1/2" x 60-1/2" (1,5 x 8,8 x 153,7 cm) BEGIN Measure 1/4" past left roof panel and line up WAB primed side out and flush up under roof panels (Fig. A). Right side of WAB is approximately 3/4" from center of rafter extension. Secure WAB using 2"...
  • Page 46 FRONT FASCIA TRIM PARTS REQUIRED: 2" (5,1 cm) 19/32" x 3-1/2" x 96" (1,5 x 8,8 x 243,8 cm) Position ZX primed side out, fl ush with WAB and fl ush up under roof panels. Secure ZX using 2" fi nish nails into rafter extensions (Fig. B). 2"...
  • Page 47 SIDE FASCIA TRIM ASSEMBLY PARTS REQUIRED: 2" (5,1 cm) 2 x 3 x 31-15/16" (5,1 x 7,6 x 81,1 cm) 19/32" x 3-1/2" x 61-1/16" (1,5 x 8,9 x 155,1 cm) 19/32" x 3-1/2" x 45" (1,5 x 8,9 x 114,3 cm) 19/32"...
  • Page 48 SIDE FASCIA TRIM PARTS REQUIRED: 2" (5,1 cm) LEFT FASCIA ASSEMBLY BEGIN Place left side fascia assembly between roof sheathing and side soffit (Fig. A, Fig. B). Install fascia assembly under roof panels flush with front fascia board. Secure with (6) 2" screws through roof sheathing (Fig. A). LEFT FACIA ASSEMBLY ROOF...
  • Page 49 SIDE FASCIA TRIM PARTS REQUIRED: 2" (5,1 cm) RIGHT FASCIA ASSEMBLY Nail up through side soffi t into fascia assembly. Secure with (7) 2" fi nish nails (Fig. C). Secure front fascia to side fascia with (2) 2" fi nished nails (Fig. D). 2"...
  • Page 50 REAR FASCIA TRIM PARTS REQUIRED: 3" (7,6 cm) 2 x 3 x 59-1/4" (5,1 x 7,6 x 150,5 cm) 2" (5,1 cm) 2 x 3 x 96" (5,1 x 7,6 x 243,8 cm) BEGIN Install PT and GKA using 2" wood screws through roof sheathing (Fig. A). 2"...
  • Page 51 REAR FASCIA TRIM PARTS REQUIRED: 2" (5,1 cm) 19/32" x 3-1/2" x 59-1/4" (1,5 x 8,8 x 150,5 cm) 19/32" x 3-1/2" x 96" (1,5 x 8,8 x 243,8 cm) Install HBA and ZX to PT and GKA. Secure with 2" fi nish nails (Fig. C). Ensure trim is primed side out.
  • Page 52 BACK CORNER TRIM PARTS REQUIRED: 2" (5,1 cm) 3/8" x 2" x 73-5/16" (0,9 x 5,1 x 186,2 cm) ¸ BEGIN Place 73-5/16" back corner trim fl ush to bottom of back soffi t board (Fig. A) and fl ush with side panel (Fig. B). Secure trim with (14) 2"...
  • Page 53 SIDE CORNER TRIM PARTS REQUIRED: 2" (5,1 cm) 3/8" x 2" x 73-7/16" (0,9 x 5,1 x 186,5 cm) 3/8" x 2" x 73-7/16" (0,9 x 5,1 x 186,5 cm) 3/8" x 2" x 93-1/8" (0,9 x 5,1 x 236,5 cm) 3/8"...
  • Page 54 FRONT TRIM PARTS REQUIRED: 2" (5,1 cm) 19/32" x 2-1/2" x 72-3/4" (1,5 x 6,3 x 184,8 cm) 19/32" x 2-1/2" x 90-5/8" (1,5 x 6,3 x 230,2 cm) ¸ BEGIN Install (2) ZD trim pieces centered and fl ush up to soffi t. Secure trim with (14) 2"...
  • Page 55 FRONT WINDOWS PARTS REQUIRED: 3/4" (1,9 cm) ¸ BEGIN Apply high quality exterior-grade caulk behind frame near edge before installing to seal window. You must caulk around windows to validate warranty. Position window in center of opening and level. Secure with (4) screws on sides of each window. (4) 3/4"...
  • Page 56 DOORS PARTS REQUIRED: 3" (7,6 cm) 1-1/4" (3,2 cm) 1 x 3 x 5" (2,5 x 7,6 x 12,7 cm) 69" (175,3 cm) Door Stiffener Left Door Right Door BEGIN Place doors on flat surface. 3/8" offset is to top. Look for red (right) and green (left) on hinge board.
  • Page 57 DOORS PARTS REQUIRED: 3" (7,6 cm) 69" Door Stiffener (175,3 cm) Install OO fl ush under panels. Secure to fl oor frame with (2) 3" screws (Fig. A). Fig. A Mark center of door opening. Flush against wall panels (2) 3" (7,6 cm) Screws TEMPORARY SUPPORT Center doors on mark (Fig.
  • Page 58 DOOR TRIM PARTS REQUIRED: 2" (5,1 cm) 64" Metal Threshold x2 or x4 3/4" (1,9 cm) 19/32" x 2-1/2" x 26-5/8" (1,5 x 6,3 x 67,6 cm) Bagged separately / special coating or 60 3/4" (1,9 cm) 19/32" x 2-1/2" x 55-1/8" (1,5 x 6,3 x 141,9 cm) 19/32"...
  • Page 59 DOOR STIFFENERS PARTS REQUIRED: 2" (5,1 cm) 69" Door Stiffener (175,3 cm) BEGIN Center OO vertically on the left door in the door opening fl ush with the edge of door (Fig. A). Secure using (5) 2" screws through outside trim into OO (Fig. B) Fig.
  • Page 60: Door Hardware

    DOOR HARDWARE PARTS REQUIRED: 1-1/4 (3,2 cm) 3/8" BIT Spring (9,5 mm) Bolt ¸ BEGIN Flush and center top spring bolt at the top of OO (Fig. A). Secure with (4) 1-1/4" screws. Mark spring bolt pin location on over door frame. Drill a 1-1/2" deep hole using a 3/8" drill bit. Flush and center bottom spring bolt to bottom of OO (Fig.
  • Page 61 DOOR HARDWARE PARTS REQUIRED: 1-1/2" (3,8 cm) 1/4" (0,6 cm) 1/2" (1,3 cm) Drill Bits BEGIN Measure and mark position on right door as shown. Pre-drill 1/4" hole at mark. Finish hole using 1/2" drill bit. Position hardware in hole and secure with screws as shown. INSTALL HANDLE ON RIGHT DOOR.
  • Page 62 FRONT WINDOW TRIM PARTS REQUIRED: 2" (5,1 cm) 19/32" x 2-1/2" x 9" (1,5 x 6,4 x 22,9 cm) 19/32" x 2-1/2" x 58-3/4" (1,5 x 6,3 x 149,2 cm) Install (2) TTB centered on over door trim. Flush bottom of TTB to top of over door trim. Secure with (8) 2"...
  • Page 63 FRONT WINDOW TRIM PARTS REQUIRED: 3/4" (1,9 cm) Install (2) TTB on window trim, centered as shown. Secure with (6) 2" fi nish nails. 2" (5,1 cm) Finish Nails Nail into FRAMING Flush CENTER You must caulk completely around window frame to validate your warranty. Use a paintable exterior rated caulk.
  • Page 64 VENTS PARTS REQUIRED: 1/2" (1,3 cm) 8 x 16" (20,3 x 35,6 cm) ¸ BEGIN Locate and mark for two vents in both side walls as shown. (1) at top and (1) at bottom Cut out marked openings. Caulk behind vent fl anges. Secure using 1/2"...
  • Page 65 PAINT & CAULK - NOT INCLUDED - • Use acrylic latex caulk that is paintable. Caulk at all horizontal and vertical seams, between the trim and walls, and all around the door trim. • Use a high quality exterior acrylic latex paint. When painting your building, there are a few key areas that can be easily overlooked that must be painted: •...
  • Page 66 DRIP EDGE PARTS REQUIRED: 1" (2,5 cm) Install side drip edge fl ush along roof panels. Flush ends to trim (Fig. A). Secure with 1" roofi ng nails 6" apart. Only nail top of drip edge. Roof Felt Drip Edge Drip Edge OVERLAP Fig.
  • Page 67 SHINGLES - NOT INCLUDED - • Follow directions provided by manufacturer and these instructions. Familiarize yourself with a 3-Tab Shingle. Notch Notch SHINGLE NAIL PATTERN 1/2" 1" Sealing Strip 1" (1,3 cm) (2,5 cm) (2,5 cm) Half A Rain Slot Full Rain Slot NAILS NEVER DRIVE FASTENERS INTO OR ABOVE SEALING STRIPS.
  • Page 68 SHINGLES continued... Install second row of shingles flush at top of first row's rain slots. Ensure flush to drip edge at back side. Stagger each row. DOOR Notch BACK OF SHED Flush with rain slots. Flush with rain slots. 1" (2,5 cm) Continue installing rows of shingles by staggering at front.
  • Page 69 SHINGLES - DRIP EDGE Install drip edge over top shingle row with 1" overhang over roof edge. 1" (2,5 cm) Using your shingle hooked blade carefully cut shingles on a fl at surface along the rain slots, using a chalk line for reference. Align remaining shingles with edge of the front drip edge.
  • Page 70 16196 Soho 12' x 8' Modern Order Form CATEGORY PART DESCRIPTION PART SIZE PART ITEM # BUILDING QTY. PART ID Gable Fascia Backer LUM SPF 2 X 3 X 72 #2&BTR Q 72000000000 Gable Fascia Backer 2 X 3 X 31 15/16" 12.5* O/E Q 31151300000 2 X 3 Front Eave Extensions...
  • Page 71 LIMITED CONDITIONAL WARRANTY* Backyard Storage Solutions, LLC warrants the following: Every product is warranted from defects in workmanship and manufacturing for 1 year. All accessories, hardware and metal components are warranted for 2 years. All Oriented Strand Board (OSB) is warranted for 2 years Siding and Trim is warranted for 15 years.