Download Print this page

Heartland VALUE Series Assembly Manual page 26

Hide thumbs Also See for VALUE Series:

Advertisement

BEGIN
Complete installation of Loft panel using 2" nails spaced 24".
1
FINISH
2
You have finished your loft panel
2"
(5 cm)
Attention: Load not to exceed 400 lbs
(181 kg) evenly distributed across Loft.
LOFT PANEL
2" (5 cm) x11
46
PARTS REQUIRED:
x2
KP
1 x 4 x 96" (2,5 x 10 x 244 cm)
Look for 3/8" SPACER
attached to doors.
x1
x1
Left Door
BEGIN
1
Orient parts as shown on flat surface.
3/8" offset is to top. Look for red
(right) and green (left) on hinge board.
Attach temporary supports KP with 1-1/4" screws in middle and 2" screws
at ends. Tighten securely.
GREEN
OFFSET
3/8"
Make sure spacer
(1 cm)
is attached.
KP
DOORS
2" (5 cm) x4
HINT:
RED
3/8"
OFFSET
(1 cm)
3/8"
(1 cm)
Screw in middle
1-1/4" (3 cm)
Screw at ends
2" (4 cm)
Tighten screws
securely.
Bottom edges flush.
3/8"
(1 cm)
47
1-1/4" (3 cm) x4

Advertisement

loading

Related Products for Heartland VALUE Series