Download Print this page

Heartland VALUE Series Assembly Manual page 29

Hide thumbs Also See for VALUE Series:

Advertisement

PARTS REQUIRED:
x2
KP
1 x 4 x 96" (2,5 x 10 x 244 cm)
BEGIN
Install a collar tie KP on the two rafters closest to the door opening.
1
2
Use three 2" nails at each side of collar tie. Collar ties should be flush to the
roof panels. Ensure the collar ties are level before nailing.
FINISH
3
You have finished installing your collar ties.
KP
Flush
Flush
HINT: For best appearance, install
COLLAR TIES
2" (5 cm) x12
DOOR
collar ties on back side of rafters.
52
PARTS REQUIRED:
x2
HQ
1 x 3 x 94-1/2" (2,5 x 7,6 x 240 cm)
BEGIN
1
Install HQ over seam of front wall panels using 2" finishing nails as shown.
2
Repeat Step 1 installing HQ over seam at back side.
FINISH
3
You have finished installing the horizontal gable trim.
2"
(5 cm)
HQ
Flush
Flush
TRIM
2" (5 cm) x20
HQ
L E V E L
53
2"
(5 cm)
Flush

Advertisement

loading

Related Products for Heartland VALUE Series