Page 1
16991 Call Us First! DO NOT RETURN TO STORE. For questions on assembly or for general inquiries, you may contact us in the following ways: Call customer service: 1-800-577-9663 AVOID THE WAIT! visit us online at help.backyardproducts.com Submit a help request Answers to frequently asked questions Live chat with an agent Did you enjoy building your shed?
Page 2
Win $500 A new winner is selected every 2 months. Review your product for the chance to win a $500 Visa Gift Card. Open camera. How to Enter: Aim. Tap. Scan Click Find your product. Submit your review. QR code above. ‘write a review’...
16991 06/25/2021 ASSEMBLY MANUAL VALUE SERIES CLASSIC 10' x 10' (304,8 x 304,8 cm) BUILDING SIZE ACTUAL FLOOR SIZE 10' x 10' (304,8 x 304,8 cm) 10' x 10' (304,8 x 304,8 cm) BASE MODEL 10' x 14' (304,8 x 426,7 cm) 10' x 14' (304,8 x 426,7 cm) ADD (1) 10' x 4' 10' x 18' (304,8 x 546,8 cm)
Page 4
TOOLS Required Optional ❑ Phillips ❑ Tool Belt/ ❑ Utility Knife Screwdriver Nail Pouch ❑ Shingle Blades ❑ Drill / Driver ❑ Tin Snips ❑ 3/8" Drill Bit ❑ Caulk Gun (for drip edge) ❑ #2 Philips Drive Bit ❑ Chalk Line ❑...
ADDITIONAL MATERIALS FOUNDATION OR FLOOR MATERIALS • This shed does not include any floor or leveling materials. • See the FLOOR LEVELING section on page 10 for recommended methods and suggested materials to properly level your floor, as this will vary depending on your specific site. REINFORCED WOOD FLOOR FRAME (OPTIONAL) IMPORTANT! Depending on your specific use you may want to construct a heavy duty floor frame by adding additional floor joists (shown below as shaded).
ADDITIONAL MATERIALS COMPLETING YOUR SHED You will need these additional materials: 10x10' 10x14' 10x18' 10x10' 10x14' 10x18' Paint for trim/Quart 3-TAB SHINGLES (Bundles)..Use 100% acrylic latex exterior paint. PAINT FOR SIDING (Gallons)..Caulk Tubes ... Use 100% acrylic latex exterior paint. Use acrylic paintable (2) coats recommended.
Page 7
PARTS IDENTIFICATION AND SIZES Double letter part identification WOOD SIZE CONVERSION CHART Nominal Board Size Actual Size is stamped on some parts. 2 x 4 ....1-1/2" x 3-1/2" (3,8 x 8,9 cm) 1 x 4 ....3/4" x 3-1/2" (1,9 x 8,9 cm) •...
Page 8
PANEL & DOORS PARTS LIST NOTE: Panel parts are not stamped with part identification. SQUARE SQUARE SQUARE EDGE EDGE EDGE LIP EDGE Left Right 3/8 x 48 x 84" 3/8 x 23-7/8 x 84" (1 x 121,9 x 213,4 cm) (1 x 121,9 x 213,4 cm) 3/8"...
Page 9
SHELVING PARTS LIST Shelf panels are 7/16" (1,1 cm) thick. 2 x 3 x 10" 1 x 4 x 23-78" (5,1 x 7,6 x 25,4 cm) (2,5 x 10,2 x 60,6 cm) 1 x 4 x 96" 3/8 x 8 x 12-1/2" (2,5 x 10,2 x 243,9 cm) (1 x 20,3 x 32 cm) 7/16 x 11-7/8 x 23-7/8"...
Page 10
GABLE EXTENDER KIT PARTS LIST Inventory your parts before you begin. We suggest sorting parts by the category they are listed in. Part identification WOOD SIZE CONVERSION CHART Nominal Board Size Actual Size is stamped on some parts. 2 x 4 ....1-1/2" x 3-1/2" (3,8 x 8,9 cm) 1 x 4 ....3/4"...
Page 11
CONCRETE FOUNDATION If you choose to install your kit on a concrete slab refer to the diagram below. Attach the sill plates on the foundaton as shown, and continue on to page 14. Treated Sill Plate Caulk between sill plate and concrete.
Page 12
OPTIONAL WOOD FRAME FLOOR LEVELING OPTIONS There are multiple ways to level your floor frame. Our recommended leveling method is shown below. Leveling materials are not included in this kit. PREFERRED METHOD - 4x4 TREATED RUNNERS (Typical for 10' x 10' Kit) Runners are generally 12"...
Page 13
LEVELING & SQUARING THE FLOOR FRAME (Not Included) LEVEL AND SQUARE FLOOR FRAME Before attaching floor decking, it is important to level and square the floor frame. A level and square floor frame is required to correctly construct your shed. See page 10 for the preferred foor leveling method.
Page 14
IMPORTANT! I M P O R T A N T ! NOTE: 10' x 10' Gable shown standard throughout manual Ensure the foor frame is level after installing foor panels. Re-level if needed. • The foor should used as a stable work surface for wall construction. •...
Page 15
WALL INDEX 10' x 10' After assembling the walls for your 10' x 10' shed, go to page 26 for wall installation. 10' x 10' Wall 01: Page 16 Wall 02: Page 18 Wall 03: Page 20 (Build 2 eave walls) 10' x 14' After assembling the walls for your 10' x 14' shed, go to page 32 for wall installation.
DOOR HEADER Assemble this door header before building any walls! Any wall with a door will require this assembly. PARTS REQUIRED: 3" (7,6 cm) 2 x 4 x 67" (5,1 x 10,2 x 170,2 cm) 7/16 x 3-1/4 x 66-3/4" (1,1 x 8,3 x 170,2 cm) BEGIN Place (1) AM and OSB end-to-end on flat surface, flush in middle.
Page 17
WALL PANEL INSTALLATION HINTS & EXAMPLES PARTS REQUIRED: 2" (5,1 cm) 2x3" TEMP. SPACER 3/4" GAUGE BLOCK 3/8 x 48 x 84" (1 x 121,9 x 213,4 cm ) Ensure your wall is square by installing one panel and squaring frame. Install all wall panels with the primed side facing up.
Page 18
GABLE WALL 01 WITH DOOR PARTS REQUIRED: 2 x 4 x 7" (5,1 x 10,2 x 17,8 cm) 3" (7,6 cm) x2 SL 2 x 4 x 36" (5,1 x 10,2 x 91,4 cm) 3" (7,6 cm) 2 x 4 x 68" (5,1 x 10,2 x 172,7 cm) 2 x 4 x 78-1/2"...
Page 19
GABLE WALL 01 WITH DOOR PARTS REQUIRED: 3" (7,6 cm) x150 2" (5,1 cm) 11-7/8" x 84" (30,2 x 213,4 cm) Temporary Brace 69" (75,3 cm) Door Stiffener Install the left panel 1-1/2" 1-1/2" from the top plate. (3,8 cm) Flush 3/4"...
Page 20
GABLE WALL 02 PARTS REQUIRED: 3" (7,6 cm) 2 x 4 x 24" (5,1 x 10,2 x 61 cm) 2 x 4 x 78-1/2" (5,1 x 10,2 x 199,4 cm) 2 x 4 x 96" (5,1 x 10,2 x 243,8 cm) BEGIN Orient parts on edge on floor as shown.
Page 21
GABLE WALL 02 PARTS REQUIRED: x136 2" (5,1 cm) 48 x 84" 23-7/8" x 84" (121,9 x 213,4 cm ) (60,6 x 213,4 cm ) 1-1/2" (3,8 cm) 3/4" BEGIN HERE (1,9 cm) Install 48" x 84" panel 1-1/2" from the top plate. Use a 2x3 spacer for consistent measurement.
Page 22
10' EAVE WALL 03 PARTS REQUIRED: 3" (7,6 cm) 2 x 4 x 44-1/2" (5,1 x 10,2 x 113 cm) 2 x 4 x 68-1/2" (5,1 x 10,2 x 174 cm) 2 x 4 x 78-1/2" (5,1 x 10,2 x 199,4 cm) Build two identical walls.
Page 23
10' EAVE WALL 03 PARTS REQUIRED: x212 2" (5,1 cm) 48 x 84" 23-7/8" x 84" (121,9 x 213,4 cm ) (60,6 x 213,4 cm ) 3/4" BEGIN HERE (1,9 cm) 3-1/2" Install 48" x 84" panel (8,9 cm) 1-1/2" from the top plate. 1-1/2"...
Page 24
14' WALL 04 PARTS REQUIRED: 3" (7,6 cm) 2 x 4 x 44-1/2" (5,1 x 10,2 x 113 cm) 2 x 4 x 48" (5,1 x 10,2 x 121,9 cm) 2 x 4 x 78-1/2" (5,1 x 10,2 x 199,4 cm) 2 x 4 x 68-1/2"...
Page 25
14' WALL 04 PARTS REQUIRED: x146 2" (5,1 cm) 23-7/8" x 84" (60,6 x 213,4 cm ) 48 x 84" (121,9 x 213,4 cm ) Install (1) 48" x 84" panel 1-1/2" from 3/4" BEGIN HERE (1,9 cm) the top plate. 1-1/2"...
Page 26
18' EAVE WALL 05 PARTS REQUIRED: 3" (7,6 cm) 2 x 4 x 44-1/2" (5,1 x 10,2 x 113 cm) 2 x 4 x 48" (5,1 x 10,2 x 121,9 cm) 2 x 4 x 68-1/2" (5,1 x 10,2 x 174 cm) 2 x 4 x 78-1/2"...
Page 27
18' WALL EAVE 05 PARTS REQUIRED: x206 2" (5,1 cm) 23-7/8" x 84" (60,6 x 213,4 cm ) 48 x 84" (121,9 x 213,4 cm ) Install (1) 48" x 84" panel 1-1/2" from 3/4" BEGIN HERE (1,9 cm) the top plate. 1-1/2"...
Page 28
STANDING YOUR WALLS The following steps show how to stand and secure your walls for a 10' x 10' shed. For a 10' x 14' shed, start on page 32. For a 10' x 18' shed, start on page 38.
Page 29
10' GABLE WALL INSTALLATION PARTS REQUIRED: 3" (7,6 cm) 69" (175,3 cm) Door Stiffener 3" (7,6 cm) 2" (5,1 cm) BEGIN 1-1/2" (3,8 cm) Center 10' wall on the 120" (304,8 cm) floor dimension. 1-1/2" (3,8 cm) overlap is to the top. Use OO as a temporary brace.
Page 30
10' EAVE WALL INSTALLATION PARTS REQUIRED 2" (5,1 cm) 3" (7,6 cm) 2" (5,1 cm) 1-1/2" (3,8 cm) 3" (7,6 cm) BEGIN Fig. B Place 10' eave wall centered on floor. 1-1/2" (3,8 cm) overlap is to the top. 2" (5,1 cm) Secure wall with (1) 2"...
Page 31
10' EAVE WALL INSTALLATION PARTS REQUIRED: 2" (5,1 cm) 3" (7,6 cm) 2" (5,1 cm) 3" (7,6 cm) 1-1/2" (3,8 cm) Fig. B BEGIN 1-1/2" (3,8 cm) Remove temporary brace OO from installed 10' gable wall. Place 2nd 10' eave wall centered on floor 2"...
Page 32
10' WALL INSTALLATION PARTS REQUIRED 2" (5,1 cm) 3" (7,6 cm) 2" (5,1 cm) 3" (7,6 cm) 1-1/2" (3,8 cm) Fig. B BEGIN 2" (5,1 cm) Place 10' wall on floor centered between 16' walls. Screw Secure wall with 2" screws into top and bottom plates (Fig.
Page 33
10' x 10' WALL DOUBLERS INSTALLATION PARTS REQUIRED: 3" (7,6 cm) x2 RL x2 JBD 2 x 4 x 24" (5,1 x 10,2 x 61 cm) 2 x 4 x 20-3/8" (5,1 x 10,2 x 51,8 cm) 3" (7,6 cm) 2 x 4 x 92-5/8"...
Page 34
14' GABLE WALL INSTALLATION PARTS REQUIRED: 3" (7,6 cm) 69" (175,3 cm) Door Stiffener 3" (7,6 cm) 2" (5,1 cm) BEGIN 1-1/2" (3,8 cm) Center 10' wall on the 120" (304,8 cm) floor dimension. 1-1/2" (3,8 cm) overlap is to the top. 3"...
Page 35
14' EAVE WALL INSTALLATION PARTS REQUIRED 2" (5,1 cm) 3" (7,6 cm) Temporary Brace 1-1/2" (3,8 cm) 2 x 4 x 92-5/8" (5,1 x 10,2 x 235 cm) 2" (5,1 cm) 3" (7,6 cm) BEGIN Fig. B Place 1st 14' eave wall centered on floor. The 1-1/2"...
Page 36
14' EAVE WALL INSTALLATION PARTS REQUIRED: 2" (5,1 cm) 3" (7,6 cm) Temporary Brace 2 x 4 x 92-5/8" (5,1 x 10,2 x 235 cm) 1-1/2" BEGIN (3,8 cm) Remove temporary brace OO from installed 10' wall. Place 2nd 14' wall centered on floor. 3"...
Page 37
14' EAVE WALL INSTALLATION PARTS REQUIRED: 3" (7,6 cm) 2" (5,1 cm) 3" (7,6 cm) 1-1/2" (3,8 cm) Nail lower edge of wall panels to floor frame with 2" nails spaced 6" apart. Angle nails into floor frame (Fig. C). Secure wall bottom plates to floor 3"...
Page 38
10' WALL INSTALLATION PARTS REQUIRED 2" (5,1 cm) 3" (7,6 cm) 2" (5,1 cm) 3" (7,6 cm) 1-1/2" (3,8 cm) Fig. B BEGIN 2" (5,1 cm) Place 10' wall on floor centered between 16' walls. Screw Secure wall with 2" screws into top and bottom plates (Fig.
Page 39
10' x 14' WALL DOUBLERS INSTALLATION PARTS REQUIRED: 3" (7,6 cm) x2 JBD 2 x 4 x 20-3/8" (5,1 x 10,2 x 51,8 cm) 2 x 4 x 48" (5,1 x 10,2 x 121,9 cm) 3" (7,6 cm) 2 x 4 x 92-5/8" (5,1 x 10,2 x 235 cm) x2 RL 2 x 4 x 96"...
Page 40
10' GABLE WALL INSTALLATION PARTS REQUIRED: 3" (7,6 cm) 69" (175,3 cm) Door Stiffener 3" (7,6 cm) 2" (5,1 cm) 1-1/2" BEGIN (3,8 cm) Center 10' wall on the 120" (304,8 cm) floor dimension. 1-1/2" (3,8 cm) overlap is to the top. 3"...
Page 41
18' EAVE WALL INSTALLATION PARTS REQUIRED 2" (5,1 cm) 3" (7,6 cm) Temporary Brace 1-1/2" (3,8 cm) 2 x 4 x 92-5/8" (5,1 x 10,2 x 235 cm) 2" (5,1 cm) 3" (7,6 cm) Fig. B BEGIN Place 1st 18' eave wall centered on floor. 2"...
Page 42
18' EAVE WALL INSTALLATION PARTS REQUIRED: 2" (5,1 cm) 3" (7,6 cm) 2" (5,1 cm) 3" (7,6 cm) Temporary Brace 1-1/2" (3,8 cm) 2 x 4 x 92-5/8" (5,1 x 10,2 x 235 cm) 2" (5,1 cm) 1-1/2" BEGIN (3,8 cm) Fig.
Page 43
10' GABLE WALL INSTALLATION PARTS REQUIRED 2" (5,1 cm) 3" (7,6 cm) 2" (5,1 cm) 3" (7,6 cm) 1-1/2" (3,8 cm) Fig. B BEGIN 2" (5,1 cm) Place 10' gable wall on floor centered Screw between installed walls. Secure wall with 2" screws into top and bottom plates (Fig.
Page 44
10' x 18' WALL DOUBLERS INSTALLATION PARTS REQUIRED: x2 JBD 3" (7,6 cm) 2 x 4 x 20-3/8" (5,1 x 10,2 x 51,8 cm) 2 x 4 x 48" (5,1 x 10,2 x 121,9 cm) 3" (7,6 cm) 2 x 4 x 92-5/8" (5,1 x 10,2 x 235 cm) x2 RL 2 x 4 x 96"...
Page 45
RAFTERS 10x10' 10x14' 10x18' PARTS REQUIRED: Temporary Support 69" (175,3 cm) Door Stiffener 6 x 24" (15,2 x 60,9 cm) 2 x 4 x 65" (5,1 x 10,2 x 165,1 cm) x120 x168 x216 2" (5,1 cm) Build (2) rafter assemblies with (1) gusset (Fig. B). BEGIN Place two rafter-halves AD in the corner of back and side walls, flush to panels and studs.
Page 46
10x18' 10x10' 10x14' RAFTER INSTALLATION PARTS REQUIRED: Page 47 Two-Gusset Preassembled One-Gusset Preassembled 3" (7,6 cm) BEGIN Align rafters over the wall studs. Check that you have the measurements shown. Secure rafters with (2) 3" screws angled at each end (Fig. A, Fig. B). Secure rafters on opposite side.
Page 47
10x18' RAFTER INSTALLATION PARTS REQUIRED: Two-Gusset Preassembled One-Gusset Preassembled 3" (7,6 cm) BEGIN Align rafters over the wall studs. Check that you have the measurements shown. Secure rafters with (2) 3" screws angled at each end (Fig. A, Fig. B). Secure rafters on opposite side.
Page 48
GABLE PANELS PARTS REQUIRED: 1-1/2" (3,8cm) 2 x 4 x 18-1/8" (5,1 x 10,2 x 46 cm) Install gable panels with the primed side facing up. BEGIN Orient parts AF on the flat side, as shown. Measure and mark the center of the middle gable panel. Secure with 1-1/2" nails spaced 6" apart along edge. Place left panel on AF flush to installed gable panel and secure with 1-1/2"...
Page 49
GABLE INSTALLATION PARTS REQUIRED: 3" (7,6 cm) 2" (5,1 cm) Pre - assembled BEGIN Measure 2-9/16" down from top plate doubler and mark at each side as shown. Set gable unit on top plate. Fasten with (1) 2" nail on each side. BE SURE GABLE IS CENTERED ON WALL BEFORE NAILING.
Page 50
10' x 10' ROOF PANELS PARTS REQUIRED: 2" (5,1 cm) 3/4" GAUGE BLOCK 7/16 x 48 x 96" (1,1 x 121,9 x 243,8 cm) Roof panels may cause serious injury until securely fastened. Note: Install all roof panels with the rough side up (painted grid lines). Flush at BEGIN peak...
Page 51
10' x 10' ROOF PANELS PARTS REQUIRED: 2" (5,1 cm) 7/16 x 23-7/8 x 48" (1,1 x 60,6 x 121,9 cm) Flush at 1/2" peak (1,2 cm) Install a 23-7/8" x 48" roof panel flush to the Fig. B Fig. A installed panel and flush at peak (Fig.
Page 52
10' x 10' ROOF PANELS PARTS REQUIRED: 2" (5,1 cm) 23-1/2" x 24" (59,7 x 61 cm) 3/4" GAUGE BLOCK 23-1/2" x 96" (59,7 x 243,8 cm) Install 23-1/2" x 96" and 23-1/2" x 23-7/8" roof panels with a 3/4" measurement on the rafter (Fig A) and flush to the installed panels.
Page 53
10' x 10' ROOF PANELS PARTS REQUIRED: x122 2" (5,1 cm) Secure all roof panels with 2" nails spaced 6" apart and 12" apart inside of the 48" wide panel. 6" (15,2 cm) Repeat steps to install roof panels on the opposite side. FINISH Your roof panels are now installed.
Page 54
10' x 14' ROOF PANELS PARTS REQUIRED: 2" (5,1 cm) 3/4" GAUGE BLOCK 7/16 x 48 x 96" (1,1 x 121,9 x 243,8 cm) Roof panels may cause serious injury until securely fastened. Note: Install all roof panels with the rough side up (painted grid lines). BEGIN Place the 48"...
Page 55
10' x 14' ROOF PANELS PARTS REQUIRED: 2" (5,1 cm) 7/16 x 48-7/8 x 48" 7/16 x 23-7/8 x 47-7/8" (1,1 x 121,6 x 121,9 cm) (1,1 x 60,6 x 121,6 cm) 1/2" Flush at (1,2 cm) peak Fig. C Fig.
Page 56
10' x 14' ROOF PANELS PARTS REQUIRED: 2" (5,1 cm) 23-7/8" x 47-7/8" 23-1/2" x 23-7/8" (59,7 x 121,9 cm) (59,7 x 60,6 cm) 3/4" GAUGE BLOCK 23-1/2" x 96" (59,7 x 243,8 cm) Install 23-1/2" x 96" roof panel with a 3/4" measurement on the rafter (Fig A) and flush to the upper installed panels. Secure panels with (1) 2"...
Page 57
10' x 14' ROOF PANELS PARTS REQUIRED: x176 2" (5,1 cm) Secure all roof panels with 2" nails spaced 6" apart and 12" apart inside of the upper panels. 6" (15,2 cm) Repeat all steps to install roof panels on the opposite side. FINISH Your roof panels are now installed.
Page 58
10' x 18' ROOF PANELS PARTS REQUIRED: 2" (5,1 cm) 3/4" GAUGE BLOCK 7/16 x 48 x 96" (1,1 x 121,9 x 243,8 cm) Roof panels may cause serious injury until securely fastened. Note: Install all roof panels with the rough side up (painted grid lines). Flush at peak BEGIN...
Page 59
10' x 18' ROOF PANELS PARTS REQUIRED: 2" (5,1 cm) 7/16 x 48-7/8 x 48" 7/16 x 23-7/8 x 47-7/8" (1,1 x 121,6 x 121,9 cm) (1,1 x 60,6 x 121,6 cm) Flush at peak Install first 47-7/8" x 48" roof Fig.
Page 60
10' x 18' ROOF PANELS PARTS REQUIRED: 2" (5,1 cm) 23-7/8" x 47-7/8" 23-1/2" x 23-7/8" (59,7 x 121,9 cm) (59,7 x 60,6 cm) 3/4" GAUGE BLOCK 23-1/2" x 96" (59,7 x 243,8 cm) Maintain spacing between the center of the rafters at the lower edge of the panels (Fig. D). Secure panels with (1) 2"...
Page 61
10' x 18' ROOF PANELS PARTS REQUIRED: x230 2" (5,1 cm) Secure all roof panels with 2" nails spaced 6" apart and 12" apart inside of the upper panels. 6" (15,2 cm) Repeat all steps to install roof panels on the opposite side. FINISH Your roof panels are now installed.
Page 62
GABLE TRIM PARTS REQUIRED: 2" (5,1 cm) 19/32" x 3-1/2" x 71-15/16" (1,5 x 8,9 x 182,7 cm) 19/32" x 3-1/2" x 71-15/16" (1,5 x 8,9 x 182,7 cm) BEGIN Install front gable trim AUR and AUL flush to top of roof panel and flush at peak, as shown (Fig. A). Secure trim with 2"...
Page 63
10' x 10' EAVE TRIM PARTS REQUIRED: 1-1/4" (3,2 cm) 3" (7,6 cm) 2 x 6 x 25-1/2" (5,1 x 15,2 x 68,4 cm) 2 x 6 x 96" (5,1 x 15,2 x 243,8 cm) BEGIN Place VX eave trim flush along edge of roof panel (Fig. A). Screw through roof panel into VX with 1-1/4"...
Page 64
10' x 14' EAVE TRIM PARTS REQUIRED: 1-1/4" (3,2 cm) 3" (7,6 cm) 2 x 6 x 25-1/2" (5,1 x 15,2 x 68,4 cm) 2 x 6 x 48" (5,1 x 15,2 x 121,9 cm) 2 x 6 x 96" (5,1 x 15,2 x 243,8 cm) BEGIN Place VF eave trim flush along edge of roof panel (Fig.
Page 65
10' x 18' EAVE TRIM PARTS REQUIRED: 1-1/4" (3,2 cm) 3" (7,6 cm) 2 x 6 x 25-1/2" (5,1 x 15,2 x 68,4 cm) 2 x 6 x 48" (5,1 x 15,2 x 121,9 cm) 2 x 6 x 96" (5,1 x 15,2 x 243,8 cm) BEGIN Install VF eave trim flush along edge of roof panel (Fig.
Page 66
CORNER TRIM PARTS REQUIRED: 2" (5,1 cm) 3/8" x 1-3/4" x 83-1/2" (1 x 4,5 x 212.1cm) BEGIN Install gable end 83-1/2" corner trim under gable panel, (Fig. A) and flush to eave wall panel (Fig. B). Secure with 2" finishing nails spaced evenly. Install eave side 83-1/2"...
Page 67
10x10' 10x14' 10x18' COLLAR TIE INSTALLATION PARTS REQUIRED: 2 x 4 x 72" (5,1 x 10,2 x 182,9 cm) 3" (7,6 cm) BEGIN Install collar tie to the rafter with (3) 3" nails at each end Fig. A (Fig. A). Flush to roof Starting at the wall with the door, install first panel...
Page 68
LOFT JOIST ASSEMBLY PARTS REQUIRED: 3" (7,6 cm) 2 x 4 x 24" (5,1 x 10,2 x 61 cm) 7/16" (11 mm) Drill Bit 2 x 4 x 96" (5,1 x 10,2 x 243,8 cm) ¸ BEGIN Orient parts TP and RL on a flat surface. Hold parts TP and RL flush and aligned.
Page 69
LOFT JOIST INSTALLATION PARTS REQUIRED: 3" (7,6 cm) x1 LW 2 x 3 x 23-7/8" (5,1 x 7,6 x 60,6 cm) 5-1/2" (14 cm) Hexb bolt, 2 washers and locknut 2 x 3 x 96" (5,1 x 7,6 x 243,8 cm) LOFT JOIST ASSEMBLY ¸...
Page 70
LOFT PANELS PARTS REQUIRED: 2" (5,1 cm) 15-7/8" x 23-7/8" (40,3 x 60,6 cm) 23-7/8" x 96" (60,6 x 244 cm) ¸ BEGIN Install loft panels centered over loft joists and ledger board. Secure with 2" nails spaced 8" apart. NOTE: There will be a gap of approximately 1/2"...
Page 71
SHELF ASSEMBLY AND INSTALLATION PARTS REQUIRED: 2" (5,1 cm) 3/8 x 8 x 12-1/2" (1 x 20,3 x 31,8 cm) 2 x 3 x10" (5,1 x 7,6 x 25,4 cm) BEGIN Secure AC to shelf panels with (3) 2" nails. Assemble (12) shelf supports as shown;...
SHELF INSTALLATION PARTS REQUIRED: 2" (5,1 cm) 7/16 x 11-7/8 x 96" OSB (1,1 x 30,2 x 243,8 cm) 1 x 4 x 96" (2,5 x 10,2 x 243,8 cm) 7/16 x 11-7/8 x 24" OSB 1 x 4 x 24" (2,5 x 10,2 x 60,1 cm) (1,1 x 30,2 x 60,1 cm) Install shelf panels centered over shelf supports, flush to wall studs and flush at seams.
Page 73
DOORS PARTS REQUIRED: 3" (7,6 cm) 1-1/4" (3,2 cm) 1 x 3 x 5" (2,5 x 7,6 x 12,7 cm) 69" (175,3 cm) Door Stiffener Left Door Right Door BEGIN Place doors on flat surface. 3/8" offset is to top. Look for red (right) and green (left) on hinge board.
Page 74
DOORS PARTS REQUIRED: 3" (7,6 cm) TEMPORARY SUPPORT 69" (175,3 cm) Door Stiffener Install OO flush under panels. Secure to floor frame with (2) 3" screws (Fig. A) . Mark center of door opening. Fig. A Flush against wall panels (2) 3"...
Page 75
DOOR STIFFENERS PARTS REQUIRED: 2" (5,1 cm) 69" (175,3 cm) Door Stiffener BEGIN Center OO vertically on the left door in the doorway (Fig. A) overlapping 1" (2,5 cm) along the edge of door (Fig. B). Secure with (7) 2" screws through outside trim into OO. Center OO vertically on the right door in the door opening offset 1"...
Page 76
DOORS PARTS REQUIRED: 2" (5,1 cm) 3/4" (1,9 cm) 19/32" x 2-1/2" x 26 5/8" (1,5 x 6,3 x 67,6 cm) 3/4" (1,9 cm) Bagged separately/ 64" Metal Threshold 19/32" x 2-1/2" x 62" (1,5 x 6,3 x 157,5 cm) special coating 19/32"...
DOOR HARDWARE PARTS REQUIRED: 3/4” (1,9 cm) BEGIN Install decorative hinges in locations shown. Secure with 3/4" screws. 3/4" (1,9 cm) Screws Flush to hinge FINISH Your decorative door hinges are now installed.
Page 78
DOOR HARDWARE PARTS REQUIRED: 5/16" (7,9 mm) Drill Bit 3/4" (1,9 cm) BEGIN Place bolt on OO in open position with bolt end 3/8" (9,5 mm) down from frame. Bolt is open when loop is contacting base (Fig A). Mark and pre-drill holes for screws. Install bolt with screws supplied. Drill 5/16"...
DOOR HARDWARE PARTS REQUIRED: 1-1/2" (3,8 cm) 3/8" (10,9 cm) Drill Bit 1/4" (0,6 cm) Drill Bit Measure and mark location of hole on outside of right door as shown (Fig. A) . Pre-drill hole with 1/4" drill. Re-drill hole with 3/8 " drill. Keep drilled hole square to trim to avoid breaking edge of door stiffener.
Page 80
GABLE WINDOW PARTS REQUIRED: 2" (5,1 cm) 3/4" (1,9 cm) 19/32" x 2-1/2" x 12" (1,5 x 6,3 x 30,5 cm) 19/32" x 2-1/2" x 17" (1,6 x 7,6 x 43,2 cm) Window BEGIN Center window in front gable as shown and secure with 3/4" screws Seal back of window with high-quality paintable exterior caulk before installing.
Page 81
HOOK & EYE PARTS REQUIRED: ¸ BEGIN Install hooks in wall and into framing behind (Fig.A). Fig. A Swing door open to locate eye. Hook Install hook into framing, if possible. FINISH You have installed your hook & eyes.
Page 82
VENT (Not included in kit.) • Follow directions provided by manufacturer and these instructions. 1/2" (13 mm) 16" x 8" BEGIN Locate and mark for two vents in side walls as shown; (1) at top and (1) at bottom. Cut out marked openings. Caulk behind vent flanges.
Page 83
PAINT & CAULK - NOT INCLUDED - • Use acrylic latex caulk that is paintable. Caulk at all horizontal and vertical seams, between the trim and walls, and all around the door trim. • Use a high quality exterior acrylic latex paint. When painting your building, there are a few key areas that can be easily overlooked that must be painted: •...
Page 84
SHINGLES - NOT INCLUDED - • Follow directions provided by manufacturer and these instructions. Familiarize yourself with a 3-Tab Shingle. Notch Notch SHINGLE NAIL PATTERN 1/2" 1" Sealing Strip (1,3 cm) 1" (2,5 cm) (2,5 cm) Half A Rain Slot Full Rain Slot NAILS NEVER DRIVE FASTENERS INTO OR ABOVE SEALING STRIPS.
Page 85
SHINGLES continued... Beginning at front of shed, install first row of shingles with notch at 1" past roof edge or flush with drip edge. Roof Deck FRONT OF BACK OF SHED SHED 1" (2,5 cm) Flush with starter row. Notch - or - Drip Edge Flush with starter row.
Page 86
SHINGLES continued... Continue installing rows of shingles to the peak. At the peak make sure there is a maximum of 5" or less to the rain slot, as shown below. If shingles overlap at ridge cut to peak with a utility knife. 5"...
Page 87
SHINGLES - RIDGE CAP • You will finish off the top of the roof with a ridge cap made from shingles. BEGIN Cut shingles in THREE pieces. Hint: Use cut-off pieces first. 2" 2" (5,1 cm) (5,1 cm) 2" 2" 2"...
Page 88
SHINGLES - RIDGE CAP continued... Continue installing ridge cap to back of roof. Make sure there is 4" between the shingle-color and edge of shingles. 4" (10,2 cm) Trim cap off fush to shingles When you have 4" minimum of shingle color cut one piece to cap your roof. Cut at top of rain slot.
Page 89
16991 10' x10' Order Form BUILDING CATEGORY PART DESCRIPTION PART SIZE PART ITEM # PART ID QTY. Loft Ledger Board "A" LUM SPF 2X3X96 #2&BTR 12115 2 X 3 Loft Ledger Board "B" 2 X 3 X 23 7/8" Q 23140000000 Shelf Support 2 X 3 X 10"...
LIMITED CONDITIONAL WARRANTY* Backyard Storage Solutions, LLC warrants the following: Every product is warranted from defects in workmanship and manufacturing for 1 year. All accessories, hardware and metal components are warranted for 2 years. All Oriented Strand Board (OSB) is warranted for 2 years Siding and Trim is warranted for 15 years.