Download Print this page

Heartland VALUE Series Assembly Manual page 23

Hide thumbs Also See for VALUE Series:

Advertisement

PARTS REQUIRED:
x4
HHP
2 x 4 x 28-3/4" (5 x 10 x 70 cm)
x4
JRA
2 x 4 x 92-5/16" (5 x 10 x 234
2
You will construct FOUR Loft Joist sub-assemblies.
3
Glue HHP onto JRA as shown. For best results use an exterior grade wood glue.
4
Nail HHP onto JRA using six 3" (7,6 cm) nails in the pattern as shown.
5
Repeat STEPS 3-4 to build THREE additional sub-assemblies.
JRA
BUILD FOUR
ASSEMBLIES
LOFT JOISTS
3" (7,6 cm) x24
GLUE
HHP
(7,6 cm)
1-1/2"
(4 cm)
5-1/2"
(14 cm)
40
6
Take two loft joist sub-assemblies and flip one end to end so they will
produce a 4" x 4" loft joist.
7
Spread glue on the surfaces which come into contact with one another as shown.
8
Nail the two sub-assemblies together using eleven 3" (7,6 cm) nails in the
pattern as shown.
9
Repeat STEPS 6-8 to build a second 4" x 4" loft joist.
FINISH
10
You have finished assembling your loft joists.
Flush
3"
LOFT JOISTS
3" (7,6 cm) x22
GLUE
GLUE
GLUE
GLUE
GLUE
119-3/4"
(304 cm)
7-3/4"
(20 cm)
41
GLUE
GLUE
GLUE
Flush
119-3/4"
3"
(7,6 cm)
(304 cm)
(7,6 cm)
1-1/2"
(4 cm)
7-3/4"
(20 cm)
BUILD TWO
ASSEMBLIES
F
3"

Advertisement

loading

Related Products for Heartland VALUE Series