Heartland BELMONT Assembly Manual

Value series. 8 inch x 8 inch (244 x 244 cm) actual floor size is: 96 x 92-5/8 inch (243,8 x 235,2 cm)

Advertisement

Quick Links

16019
STOP!
STOP!
Call Us First!
DO NOT RETURN TO STORE.
For immediate help with assembly or product information
call our toll free number:
1-800-577-9663
or email:
customerservice@backyardproductsllc.com
Our staff is ready to provide assistance
April through October M-F 8:00 AM to 4:30 PM EST
Saturday 8:30 AM to 4:30 PM EST
November through March M - F 8:00 AM to 5:00 PM EST

Advertisement

loading

Summary of Contents for Heartland BELMONT

  • Page 1 16019 STOP! STOP! Call Us First! DO NOT RETURN TO STORE. For immediate help with assembly or product information call our toll free number: 1-800-577-9663 or email: customerservice@backyardproductsllc.com Our staff is ready to provide assistance April through October M-F 8:00 AM to 4:30 PM EST Saturday 8:30 AM to 4:30 PM EST November through March M - F 8:00 AM to 5:00 PM EST...
  • Page 2 (This page intentionally left blank.)
  • Page 3: Assembly Manual

    16019 ASSEMBLY MANUAL A Backyard Products Company VALUE SERIES BELMONT 8' x 8' (244 x 244 cm) ACTUAL FLOOR SIZE IS: 96 x 92-5/8" (243,8 x 235,2 cm) KEEP THIS MANUAL FOR FUTURE REFERENCE I M PO RTAN T ! READ INSTRUCTIONS THOROUGHLY PRIOR TO BEGINNING ASSEMBLY.
  • Page 4 TOOLS Required Optional q Phillips q Tool Belt/ q Utility Knife Screwdriver Nail Pouch q Shingle Blades q Tin Snips q Drill / Driver (for drip edge) q Caulk Gun q 5/16" Drill Bit q Chalk Line q 1/8" Drill Bit q #2 Philips Drive Bit q Paint Tools q Nail Gun...
  • Page 5 CONCRETE FOUNDATION If you choose to install your kit on a concrete slab refer to the diagram below. Treated Sill Plate Caulk between sill plate and concrete. 3-1/2" (8,9 cm) 4" (10,2 cm) Building Size Actual Floor Size 8'x 8' (243,8 x 243,8 cm) 92-5/8"...
  • Page 6: Optional Materials

    ADDITIONAL MATERIALS FOR BUILDING YOUR SHED 3-TAB SHINGLES ......4 Bundles 1" GALVANIZED ROOFING NAILS..2 Lbs For shingles. PAINT FOR SIDING ......2 Gallons PAINT FOR TRIM ......1 Quart Use 100% acrylic latex exterior paint. Use 100% acrylic latex exterior paint. (2) coats recommended. CAULK ..........
  • Page 7 PARTS IDENTIFICATION AND SIZES WOOD SIZE CONVERSION CHART stamped on some parts. Nominal Board Size Actual Size 2" x 4"....1-1/2" x 3-1/2" (3,8 x 8,9 cm) 1" x 4"....3/4" x 3-1/2" (1,9 x 8,9 cm) 2" x 3"....1-1/2" x 2-1/2" (3,8 x 6,3 cm) 1"...
  • Page 8 WALL PANELS, AND DOORS 3/8 x 20 x 72" 3/8 x 48 x 72" 3/8 x 46-1/8 x 72" LEFT DOOR RIGHT DOOR (1 x 121,9 x 182,9 cm) (1 x 117,2 x 182,9 cm) (1 x 50,8 x 182,9 cm) ROOF PANELS 48"...
  • Page 9 FLOOR LEVELING OPTIONS There are multiple ways to level your floor frame. Our recommended leveling method is shown below. Leveling materials are not included in this kit. PREFERRED METHOD - 4x4 TREATED RUNNERS 96" (243,8 cm) • 3" Screw angled into 4x4. •...
  • Page 10 FLOOR FRAME (NOT INCLUDED) PARTS REQUIRED: 3" (7,6 cm) TREATED 2 x 4 x 96" (5,1 x 10,2 x 243,8 cm) Floor framing materials not included. See page 4 TREATED for sizes and quantities. 2 x 4 x 92-5/8" (5,1 x 10,2 x 235,2 cm) •...
  • Page 11 LEVEL AND SQUARE FLOOR FRAME Before attaching floor decking, it is important to level and square the floor frame. A level and square floor frame is required to correctly construct your shed. BEGIN See page 7 for the preferred floor leveling method. Use level and check the frame is level before applying floor panels.
  • Page 12 FLOOR PANELS (NOT INCLUDED) PARTS REQUIRED: 2" (5,1 cm) Floor Panels not included See page 4 for panel sizes 5/8 x 48 x 92-5/8" and quantities. (1,6 x 122 x 235,2 cm) Ensure your fl oor frame is square by installing one panel and squaring frame. BEGIN Attach the 5/8 x 48 x 92-5/8"...
  • Page 13 FLOOR PANELS (NOT INCLUDED) PARTS REQUIRED: 2" (5,1 cm) 5/8 x 48 x 92-5/8" (1,6 x 122 x 235,2 cm) Continue by installing 5/8 x 48 x 92-5/8" panel with rough side up (painted grid lines). Use a chalk line or grid lines on panels for 2" nails 6" apart on edges and 12"...
  • Page 14 IMPORTANT! I M P O R T A N T ! Check the floor frame is level after installing floor panels. Re-level if needed. • The floor should be used as a stable work surface for wall construction. HINT: • Organize your assembly procedure during the build process to avoid over-handling of the walls.
  • Page 15 SIDE WALL FRAMES PARTS REQUIRED: 3" (7,6 cm) 2 x 3 x 66-1/2 " (5,1 x 7,6 x 168,9 cm) 2 x 3 x 92-1/2" (5,1 x 7,6 x 235 cm) BEGIN Orient parts on edge on floor. Measure and mark from end of boards. IMPORTANT! You will build two walls the same.
  • Page 16 SIDE WALL PANELS PARTS REQUIRED: 2" (5,1 cm) 2x3" 3/4" GAUGE BLOCK GAUGE BLOCK 3/8 x 46-1/8 x 72" (1 x 117,2 x 182,8 cm) Ensure your wall frame is square by installing one panel and squaring frame. BEGIN Place a 46-1/8 x 72" panel onto wall frame with primed side up as shown. Locate the panel 1-1/2"...
  • Page 17 SIDE WALL PANELS PARTS REQUIRED: 2" (5,1 cm) 2x3" GAUGE BLOCK 3/8 x 46-1/8 x 72" (1 x 117,2 x 182,8 cm) Place 46-1/8" panel on frame as shown with primed side facing up flush with first panel. Nail using 2" nails 6" apart on edges and 12" apart inside panel.
  • Page 18 BACK WALL FRAME PARTS REQUIRED: 3" (7,6 cm) 2 x 3 x 34" (5,1 x 7,6 x 86,4 cm) 2 x 3 x 91 " (5,1 x 7,6 x 231,1 cm) BEGIN Orient on flat using a gusset as a temporary spacer. flush on CI on edge on floor as shown (Fig.
  • Page 19 BACK WALL FRAME PARTS REQUIRED: 3" (7,6 cm) 3" (7,6 cm) 2 x 3 x 34" (5,1 x 7,6 x 86,4 cm) 2 x 3 x 96" (5,1 x 7,6 x 243,8 cm) Center flush on PS on flat using a gusset as a temporary spacer. on CI on edge on floor as shown.
  • Page 20 BACK WALL PANELS PARTS REQUIRED: 2" (5,1 cm) 3/8 x 48 x 72" (1 x 121,9 x 182,9 cm) BEGIN Place LEFT panel on back frame as shown with primed side facing up. Secure Using 2" nails 6" apart on edges and 12" apart inside panel. For squareness maintain flush and 3/4"...
  • Page 21 BACK WALL PANELS PARTS REQUIRED: 2" (5,1 cm) 1-1/2" (3,8 cm) 3/8 x 48 x 72" (1 x 121,9 x 182,9 cm) Place RIGHT panel on back frame as shown with primed side facing up and flush to panel. Ensure 34" (86,4 cm) between PT and PS. Secure Using 2"...
  • Page 22 FRONT WALL FRAME PARTS REQUIRED: 2" (5,1 cm) 2 x 3 x 17-1/2" (5,1 x 7,6 x 44,5 cm) 3/8 x 20 x 72" (1 x 50,8 x 182,9 cm) TEMPORARY SUPPORT 2 x 3 x 96" (5,1 x 7,6 x 243,8 cm) BEGIN Orient PT on edge and place LEFT panel on PT as shown with primed side facing up.
  • Page 23 FRONT WALL PANELS PARTS REQUIRED: 2" (5,1 cm) 2 x 3 x 17-1/2" (5,1 x 7,6 x 44,5 cm) BEGIN Position BV on edge, 2-1/2" from outside edge and 1" from bottom edge of LEFT wall panel. (Fig A.) Nail BV to wall panel using (3) 2" Nails. Repeat step 1-2 for RIGHT wall panel.
  • Page 24 FRONT WALL TOP PLATE PARTS REQUIRED: 3" (7,6 cm) GUSSET 2 x 3 x 66-1/2" (5,1 x 7,6 x 168,9 cm) TEMPORARY SPACER BEGIN Center FZ on PT on flat, flush to front wall panel (Fig. A). Secure using five 3" screws on angle spaced evenly. Mark center of door opening for later alignment.
  • Page 25 SIDE WALL INSTALLATION PARTS REQUIRED (TEMPORARY): 3" (7,6 cm) 1-1/4 x 2-1/2 x 69" (3,2 x 7,6 x 175,3 cm) 3" (7,6 cm) TEMPORARY SUPPORT 2" (5,1 cm) BEGIN Center side wall assembly on the 92-1/2" (235 cm) floor dimension. Ensure 1-1/2"...
  • Page 26 SIDE WALL INSTALLATION PARTS REQUIRED: SIDE WALL INSTALLATION 3" (7,6 cm) 1-1/2" (3,8 cm) PARTS REQUIRED: 2" (5,1 cm) 3" (7,6 cm) 1-1/2" (3,8 cm) It is important to secure the 2" (5,1 cm) side wall in the following order: BEGIN Set back wall on side wall top plates and secure using two 3"...
  • Page 27 FRONT WALL INSTALLATION PARTS REQUIRED: 3" (7,6 cm) 2" (5,1 cm) 3" (7,6 cm) 1-1/2" (3,8 cm) It is important to secure the front wall in the following order: BEGIN Center front wall assembly on floor, resting top plate on side walls. Secure front wall top plate to side walls using two 3"...
  • Page 28 RAFTERS PARTS REQUIRED: 2" (5,1 cm) 6 x 24" (15,2 x 61 cm) 1-1/4 x 2-1/2 x 69" (3,2 x 7,6 x 175,3 cm) TEMPORARY SUPPORT 2 x 4 x 54-1/16" (5,1 x 10,2 x 129,8 cm) BEGIN You will build THREE assemblies; Place two rafter-halves WI in the corner of back and side walls.
  • Page 29 RAFTERS PARTS REQUIRED: 3" (7,6 cm) 2" (5,1 cm) PRE-ASSEMBLED BEGIN Locate rafters directly over the wall studs. Ensure you have the measurements shown. Screw through panel into end of rafter with 2" screw (Fig. A). Secure with two 3" screws angled at each end (Fig. B). FINISH You have finished installing your rafters.
  • Page 30 BACK WALL GABLE PANELS PARTS REQUIRED: 1-1/2" (3,8 cm) 2 x 3 x 23-7/8" (5,1 x 7,6 x 60,6 cm) BEGIN Place LW on flat on floor. Place RIGHT gable panel primed side up, centered on LW with a 3/4" overhang on bottom.
  • Page 31 BACK WALL GABLE PANELS PARTS REQUIRED: 3" (7,6 cm) 2" (5,1 cm) PRE-ASSEMBLED BEGIN Place gable assembly centered on back wall top plate overlapping the back wall panels 3/4" (Fig. A). Nail assembly to back wall panels using 2" nails 6" apart. Screw LW to top plate using two 3"...
  • Page 32 FRONT WALL GABLE PANELS PARTS REQUIRED: 1-1/2" (3,8 cm) 2 x 3 x 11-7/8" (5,1 x 7,6 x 30,2 cm) BEGIN Place DQ on flat on floor as shown. Place RIGHT gable panel primed side up, centered on top DQ as shown. Secure using two 1-1/2"...
  • Page 33 WINDOW INSTALL PARTS REQUIRED: 1" (2,5 cm) 1/8" (0,3 cm)Drill Bit BEGIN Center window in window opening as shown. Make sure both Center window in window opening as shown.Make sure frame is at an measurements are equal from bottom. equal distance from bottom of panel (Fig. A). Secure window to DQ using one screw in top and bottom (Fig.
  • Page 34 WINDOW INSTALL WINDOW INSTALL ARTS REQUIRED: PARTS REQUIRED: 1-5/8" (4,1 cm) 1/2" (1,3 cm) 1 x 2 x 11" (2,5 x 5,1 x 27,9 cm) 1/2" (1,3 cm) 1 x 2 x 11" (2,5 x 5,1 x 27,9 cm) NOTE POINT 1 x 2 x 14"...
  • Page 35 FRONT WALL GABLE PANELS PARTS REQUIRED: WINDOW INSTALL 3" (7,6 cm) PARTS REQUIRED: 2" (5,1 cm) 1/8" (0,3 cm)Drill Bit PRE-ASSEMBLED BEGIN Center window in window opening as shown. Make sure both measurements are equal from bottom. BEGIN Place gable assembly centered on front wall top plate overlapping front wall panels.
  • Page 36 GABLE TRIM PARTS REQUIRED: 1-1/4" (3,2 cm) 2 x 3 x 55-3/4" (5,1 x 7,6 x 141,6 cm) ¸ BEGIN Install front gable trim WX flush to top edge of panel and flush at peak (Fig. A) as shown. Attach trim to wall using 1-1/4" screws 7-1/4" apart. Screw through panels into WX.
  • Page 37 ROOF PANELS PARTS REQUIRED: 2" (5,1 cm) 7/16 x 48 x 96" (1,1 x 121,9 x 243,8 cm) Roof panels may cause serious injury until securely fastened. You must square the roof by attaching one panel first. You will use the panels’ long edge as a lever to bring your roof into square.
  • Page 38 ROOF PANELS PARTS REQUIRED: 2" (5,1 cm) 7/16 x 7-7/8" x 96" (1,1 x 20 x 243,8 cm) Keep spacing between the center of the rafters at the lower edge of the panel and secure with one 2" nail into each rafter (Fig.
  • Page 39 TRIM PARTS REQUIRED: 2" (5,1 cm) 3/8 x 1-3/4 x 71-1/4" (1 x 4,4 x 181 cm) 3/8 x 1-3/4 x 71-3/4" (1 x 4,4 x 182,2 cm) ¸ BEGIN Attach 71-3/4" trim � ush to back of gable trim and bottom of roof panel and trim (Fig.
  • Page 40 DOORS PARTS REQUIRED: 3" (7,6 cm) 1-1/4 x 2-1/2 x 69" (3,2 x 7,6 x 175,3 cm) 1-1/4" (3,2 cm) TEMPORARY SUPPORT HINT: Look for 3/8" SPACER attached to doors. x1 GAA 1 x 3 x 5" (2,5 x 7,6 x 12,7 cm) Left Door Right Door BEGIN...
  • Page 41 DOORS PARTS REQUIRED: 3" (7,6 cm) 1-1/4 x 2-1/2 x 69" (3,2 x 7,6 x 175,3 cm) TEMPORARY SUPPORT Attach temporary support OO as a ledger board flush under wall panels for doors to rest on, using three 3" screws (Fig. A) . 72"...
  • Page 42 DOOR PARTS REQUIRED: 2" (5 cm) 3/4" (1,9 cm) 19/32 x 3 x 63" (1,5 x 7,6 x 160 cm) 3/4" (1,9 cm) 56" (142,2 cm) Metal Threshold Bagged separately / special coating BEGIN Secure hinge boards from inside using 3/4" screws as shown (Fig. A). Reinforce the door trim using 3/4"...
  • Page 43 DOOR WEATHERSTRIP PARTS REQUIRED: 2" (5 cm) 1-1/4 x 2-1/2 x 69" (3,2 x 7,6 x 175,3 cm) BEGIN With left door closed, center a weatherstrip OO vertically on the left door in the door opening (Fig. A). OO will offset the left door 1" OUT past the door trim 1"...
  • Page 44 DOOR PARTS REQUIRED: 1" (2,5 cm) 5/16" (0,8 cm) Drill Bit 3/4" (1,9 cm) BEGIN Place bolt onto OO in open position with bolt end 1/4" down from frame. Bolt is open when loop is contacting base (Fig A) . Mark and pre-drill holes for screws.
  • Page 45 PAINT & CAULK - NOT INCLUDED - • Use acrylic latex caulk that is paintable. Caulk at all horizontal and vertical seams, between the trim and walls, and all around the door trim. • Use a high quality exterior acrylic latex paint. When painting your building, there are a few key areas that can be easily overlooked that must be painted: •...
  • Page 46 SHINGLES - NOT INCLUDED - • Follow directions provided by manufacturer and these instructions. Familiarize yourself with a 3-Tab Shingle. Notch Notch SHINGLE NAIL PATTERN 1/2" 1" Sealing Strip 1" (1,3 cm) (2,5 cm) (2,5 cm) Half A Rain Slot Full Rain Slot NAILS NEVER DRIVE FASTENERS INTO OR ABOVE SEALING STRIPS.
  • Page 47 SHINGLES continued... Beginning at front of shed, install first row of shingles with notch at 1" past roof edge or flush with drip edge. Roof Deck FRONT OF BACK OF SHED SHED 1" (2,5 cm) Flush with starter row. Notch - or - Drip Edge Flush with starter row.
  • Page 48 SHINGLES continued... Continue installing rows of shingles to the peak. At the peak make sure there is a maximum of 5" or less to the rain slot, as shown below. If shingles overlap at ridge cut to peak with a utility knife. 5"...
  • Page 49 SHINGLES - RIDGE CAP • You will finish off the top of the roof with a ridge cap made from shingles. BEGIN Cut shingles into THREE pieces. Hint: Use cut-off pieces first. 2" 2" (5,1 cm) (5,1 cm) 2" 2" 2"...
  • Page 50 SHINGLES - RIDGE CAP continued... Continue installing ridge cap to back of roof. Make sure there is 4" between the shingle-color and edge of shingles. Trim cap off flush to shingles When you have 4" minimum of shingle color cut one piece to cap your roof. Install flush to shingles.
  • Page 51 Run code: found on exterior product label or assembly instructions enclosed in the product package. All other inquiries can be mailed to: Backyard Storage Solutions, LLC Attn: Customer Service 1000 Ternes Monroe, MI 48162 *WARRANTY TERMS MAY VARY OUTSIDE THE U.S.A. IMPORTANT: This is your warranty certificate. Heartland LDR: 1/19/2016...