Proline Promass E TB2 HART
Endress+Hauser
10
Commissioning
10.1
Function check
Before commissioning the measuring device, ensure that the post-installation and post-connection
check have been carried out.
• Checklist for "Post-mounting check" (® ä 24)
• Checklist for "Post-connection check" (® ä 28)
10.2
Switching on the measuring device
After a successful function check, switch on the measuring device.
After a successful startup, the local display switches automatically from the startup display to the
measured value display.
If nothing appears on the local display or a diagnostic message is displayed, refer to the chapter
on "Diagnostics and troubleshooting" (® ä 81).
10.3
Setting the operating language
Factory setting: English or ordered local language
X X X X X X X
X
X
20.50
Main menu
Language
Display/operat.
Setup
1.
2.
0104-1
English
Language
0104-1
Ã
English
Deutsch
Español
Language
Français
Ã
English
Deutsch
Español
Français
Hauptmenü
Commissioning
3.
4.
0104-1
0104-1
Sprache
Deutsch
Anzeige/Betrieb
Setup
5.
A0013996
51