Ensuring The Degree Of Protection Of The Measuring Device; Post-Connection Check - Endress+Hauser Proline Promass E TB2 HART Operating Instructions Manual

Coriolis mass flow measuring system
Table of Contents

Advertisement

Electrical connection
28
R [ ]
W
b
600
500
400
300
200
100
0
12
14
1
Operating range
7.3
Ensuring the degree of protection of the measuring
device
The measuring device fulfills all the requirements for the IP 66 and 67 (NEMA 4X) degree of
protection.
To guarantee IP 66 and IP 67 degree of protection (NEMA 4X), carry out the following steps after
the electrical connection:
1.
Check that the housing seals of the connection and electronics compartment are fitted neatly
and correctly. Dry, clean or replace the seals if necessary.
2.
Tighten all housing screws and screw covers.
3.
Firmly tighten the cable glands.
4.
So that any moisture that occurs does not reach the entry, before the cable entry, form the
cable into a downward-hanging loop ("water trap").
Ã
5.
Insert dummy plugs into unused cable entries.
7.4

Post-connection check

Are cables or the device damaged (visual inspection)?
Do the cables comply with the requirements (® ä 25)?
Do the cables have adequate strain relief?
Are all cable glands installed, firmly tightened and correctly sealed? Cables looped as "water traps" (® ä
28)?
Does the supply voltage match the specifications on the transmitter nameplate (® ä 27)?
Is the terminal assignment correct (® ä 26)?
16
18
20
22
24
26
Proline Promass E TB2 HART
1
U [V]
s
28
30
32
Endress+Hauser
A0013563
A0013960