Putting the unit into service
7
Filling out the commissioning report
Minimum connection pressure available?
Connection pressure: _______________ bar
Water connection made properly?
Lines and connections have no leaks?
Mixing battery mounted properly?
Wastewater connection made properly?
On-site waste trap
Funnel discharge
Wastewater pipe dimension: ____________________ mm (in)
Set up under exhaust hood?
Connected to exhaust air duct?
Exhaust air pipe dimension: ____________________ mm (in)
Exhaust air pipe length: ________________________ m (in)
Was the unit put into service?
Comments:
Operator trained?
Electrical installation was provided by:
Company
40
Water connection
Wastewater connection
Vacuum breaker
Exhaust air connection
Final notes
Installer
City, date
Yes
No
Yes
No
Yes
No
Yes
No
Signature