14. Remove hose support (A) from the windrower frame.
15. Route hoses (B) and electrical harness onto the header.
16. Move maintenance platform (A) to the
CLOSED position. For instructions, refer to the
windrower operator's manual.
17. For instructions on mechanically detaching the header
from the windrower, refer to the windrower operator's
manual.
214366
OPERATION
Figure 3.94: Hose Bundle
A
Figure 3.95: Windrower Left Platform
74
B
A
Revision A