MacDon R85 Operator's Manual page 87

Rotary disc 16-foot header for self-propelled windrower
Table of Contents

Advertisement

11. For windrowers with self-aligning center-link: Use
HEADER TILT cylinder switches (A) on GSL to release
load on center-link cylinder.
12. Operate the link lift cylinder with the REEL UP
switch (B) to disengage the center-link from the header.
13. For windrowers without self-aligning center-link:
Shut off the engine and remove the key.
14. Lift hook release (C) and lift hook (B) off header pin.
CAUTION
Check to be sure all bystanders have cleared the area.
15. Start the engine.
16. Back the windrower slowly away from header.
17. Reinstall clevis pin (A) through support (C) and secure
with hairpin (B). Repeat for opposite side.
214366
OPERATION
A
Figure 3.84: GSL
Figure 3.85: Hydraulic Center-Link
Figure 3.86: Header Support
70
B
C
A
B
B
A
Revision A
C

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents