Annex 2: Installation and System Turn ON Progress List
Tick after
No.
completion
The environment is meeting all technical requirements.
3.3.1
3.3.2
☐
1
3.3.3
3.3.4
3.3.5
3.3.6
Battery
☐
2
requirements.
☐
Control Module (BMS) and Battery Module are installed
3
well.
☐
4
The MBMS are installed well. (If configured.)
☐
Connect External Power Cable +/- between each BMS
5
to the PCS or confluence cabinet.
☐
6
Connect power cables of each battery string.
☐
7
Connect communication cables of each battery string.
Set up ADD switch of every BMS and the MBMS
☐
8
(Address Assignment).
☐
Connect external communication cables from BMS to
9
BMS, MBMS, inverter, PCS or another.
☐
Connect the communication cable from MBMS to the
10
PCS.
Double check every power cables, communication
☐
11
cables installed well. And ADD Switches are setting
right.
☐
Check the UPS is turned on. And the UPS is power
12
supplying. (If configured)
☐
Switch the external power or PCS on, to sure all the
13
power equipments can work normally.
Turn the BMS (Battery Control Modules) of each battery
string on (from 1
☐
14
Cleaning
Temperature
Radiating System
Heating System
Fire-extinguisher System
Grounding System
rack
is
installed
BMS to the last, one by one)
st
Turn on the "Power Switch":
Turn on the "Start Button":
The battery string's system will check itself, if
work normal the battery string system will
goes into
self-check
If has failure during the self-check, must debug
42
Item
follow
the
technical
mode.
Remark
Refer to chapter
3.3
Refer to chapter
3.5.3.
Refer to chapter
3.5.4.
Refer to chapter
3.5.5.
Refer to chapter
3.6.2.
Refer to chapter
3.6.2.
Refer to chapter
3.6.2.
Refer to chapter
3.6.3.
Refer to chapter
3.6.2.
Refer to chapter
3.6.2.
Refer to chapter
3.6.2 and 3.6.3.
Refer to chapter
3.6.4.
Refer to chapter
3.6.4.
Refer to chapter
3.6.4.