Annex 1: Installation And System Turn On Progress List - Pylontech Force-H1 Operation Manual

Lithium-ion phosphate energy storage system
Table of Contents

Advertisement

Annex 1: Installation and System Turn ON Progress List

Tick after
No.
completion
1
2
3
4
5
6
7
8
9
10
11
The environment is meeting all technical requirements.
3.3.1
Cleaning
3.3.2
Temperature
3.3.3
Radiating System
3.3.4
Heating System
3.3.5
Fire-extinguisher System
3.3.6
Grounding System
Selection of installation sites.
Battery
base
is
installed
requirements.
Battery modules installation.
Battery system are fixed.
Control Module (BMS) and Battery Module are installed
well.
Connect D+ and D- between BMS to the inverter/PCS
or confluence cabinet.
Connect the grounding cable.
Double check every power cables, communication
cables, grounding cable installed well.
Switch the external power or inverter/PCS on, ensure all
the power equipment can work normally.
The first installation should do full charging progress
automatically.
If the status LED of BMS turns to blue, it means this battery
string is operation.
Item
follow
the
36/34
Remark
Refer to chapter
3.3
Refer to chapter
3.4.3.
technical
Refer to chapter
3.4.4.
Refer to chapter
3.4.5.
Refer to chapter
3.4.6.
Refer to chapter
3.4.7.
Refer to chapter
3.5.2.
Refer to chapter
3.5.1.
Refer to chapter
3.5.2 and 3.5.1.
Refer to chapter
3.6.4.