Summary of Contents for Pylontech Powercube-H1

  • Page 1 PYLONTECH Product Presentation Page 1 Contact SegenSolar (PTY) Ltd | e: info@segensolar.co.za | t: 08780 20663...
  • Page 2 PRODUCT OVERVIEW APPLICATION & CONFIGURATION INSTALLATION TROUBLE SHOOTING Page 2 Contact SegenSolar (PTY) Ltd | e: info@segensolar.co.za | t: 08780 20663...
  • Page 3 PRODUCT OVERVIEW Page 3 Contact SegenSolar (PTY) Ltd | e: info@segensolar.co.za | t: 08780 20663...
  • Page 4 System parameter feature Table 1 Powercube H series product parameters[1] Page 4 Contact SegenSolar (PTY) Ltd | e: info@segensolar.co.za | t: 08780 20663...
  • Page 5 Battery module parameter feature Table 2 Powercube H series product parameters[2] Page 5 Contact SegenSolar (PTY) Ltd | e: info@segensolar.co.za | t: 08780 20663...
  • Page 6 Ascendancy Compared with most types of LV batteries in the market, Pylon batteries posses: DoD – 95% Focused on ESS, has more than 10 years manufacturing experience Voltage output – Max. 1000V with 74 Ah module Weight – 32kG for a 3.6kWh module Efficiency –...
  • Page 7: Application & Configuration

    APPLICATION & CONFIGURATION Page 7 Contact SegenSolar (PTY) Ltd | e: info@segensolar.co.za | t: 08780 20663...
  • Page 8 Application Page 8 Contact SegenSolar (PTY) Ltd | e: info@segensolar.co.za | t: 08780 20663...
  • Page 9 Commercial Note: For the PV/battery sizing ratio, there is no strict rules but guidance at 1:2 as min. (e.g. 1kW PV shall sizing 2kWh battery system as min. capacity) for back-up and off-grid application. Page 9 Contact SegenSolar (PTY) Ltd | e: info@segensolar.co.za | t: 08780 20663...
  • Page 10: System Configuration

    System Configuration Item Racks Amount Capacity Voltage Charge upper Discharge lower- Current level voltage (Vdc) voltage (Vdc) (kWh) (Vdc) 0.5C constant 17.8 217.5 21.3 24.9 304.5 28.4 Single rack 32.0 391.5 35.5 39.1 478.5 Max. 80A H48074 @15s 42.6 46.2 565.5 49.7 53.3...
  • Page 11 Quotation items 1.Battery Module(BMS & H48074) – varying amount depends on application. 2.External Cable kits 3.Brackets/Cabinets –if necessary. Page 11 Contact SegenSolar (PTY) Ltd | e: info@segensolar.co.za | t: 08780 20663...
  • Page 12: Installation

    INSTALLATION Page 12 Contact SegenSolar (PTY) Ltd | e: info@segensolar.co.za | t: 08780 20663...
  • Page 13: Checking List

    CHECKING LIST For battery module package: One power cable (Serial Connection) ,one battery communication cable for each battery package: Figure 1: PowerCube H2 battery module package Page 13 Contact SegenSolar (PTY) Ltd | e: info@segensolar.co.za | t: 08780 20663...
  • Page 14 CHECKING LIST For BMS Controller connects to inverter: One positive power cable (orange to orange ),one communication cable and user manual for each Controller package: Figure 2: PowerCube H2 battery module package Page 14 Contact SegenSolar (PTY) Ltd | e: info@segensolar.co.za | t: 08780 20663...
  • Page 15 CHECKING LIST External cable kits 1 Pair of power cables - One positive power cable (orange) - One negative power cable (black) Figure 6: Battery external cable kits Page 15 Contact SegenSolar (PTY) Ltd | e: info@segensolar.co.za | t: 08780 20663...
  • Page 16: Before You Start

    BEFORE YOU START Before you install. please make sure all the requirements for the insallation location & environment are met. Please refer to the installation manual and make sure you have all the necessary tools required. PLEASE CHECK THE FOLLOWING The ambient temperature is within the range of 0°C to 50°C.
  • Page 17 Installation Battery Module Front Interface: Figure 3: H48050 front interface Page 17 Contact SegenSolar (PTY) Ltd | e: info@segensolar.co.za | t: 08780 20663...
  • Page 18 Installation Battery BMS Module (SC0500/1000-100S) Front Interface: Figure 4: BMS module front interface Page 18 Contact SegenSolar (PTY) Ltd | e: info@segensolar.co.za | t: 08780 20663...
  • Page 19 Installation Battery 3rd Level Control Module (MBMS) Front Interface: Figure 5: MBMS front interface Page 19 Contact SegenSolar (PTY) Ltd | e: info@segensolar.co.za | t: 08780 20663...
  • Page 20 Attention: The orange terminal of power cable should connect to the orange • terminal of the battery while the black terminal of power cable should connect to the black terminal of the battery. HV system's grounding is based on metal directly touch between •...
  • Page 21 Figure 6: H48074 system cable connection Note: The 1stPowerCube-H1/H2 should be installed nearest to the MBMS. Page 21 Contact SegenSolar (PTY) Ltd | e: info@segensolar.co.za | t: 08780 20663...
  • Page 22: Before Power On

    Before power ON: Double check all the power cables and communication cables. • Turn on the 1st BMS (Battery Control Modules) of battery string. • The second BMS must be turned on after the first battery string’s self-check is • successful.
  • Page 23 POWER ON Turn on the “POWER SWITCH” • Figure 7: BMS power switch Page 23 Contact SegenSolar (PTY) Ltd | e: info@segensolar.co.za | t: 08780 20663...
  • Page 24 POWER ON For off-grid systems or emergency situations: Page 24 Contact SegenSolar (PTY) Ltd | e: info@segensolar.co.za | t: 08780 20663...
  • Page 25 POWER ON Switch the MBMS on after all the BMS units turn on successful: • Figure 8: MBMS power switch TIPS: The battery string’s system will check itself. Self-check will be finish within 10sec. • If the BMS can’t receive communication from upper equipment because of the •...
  • Page 26: Power Off

    POWER OFF Turn off the “Power Switch” of the MBMS. If the ESS configures only single battery • without MBMS, then ignore this operation step. Page 26 Contact SegenSolar (PTY) Ltd | e: info@segensolar.co.za | t: 08780 20663...
  • Page 27 POWER OFF Soft-off the PCS through PCS’s control panel. • Turn off the “Power Switch” of the BMS. • TIPS: DO NOT turn off the “Power Relay Switch” during normal running condition, only in emergency case it could be turned off directly. Page 27 Contact SegenSolar (PTY) Ltd | e: info@segensolar.co.za | t: 08780 20663...
  • Page 28 Inverter Suitable Numbers Voltage capacity Communication Application Key features Installation brand battery range (Max. 36 Activation Force type groups) charge Solis Power 5-11/group 160-600 5k/6k On/Off-grid Wall Cube mounting /10k H1/H2, X1/X2, Atess 8-11/group 352-600 30k/50k On/Off-grid Cabinet Force /120k H1/H2 /150k 8-10/group...
  • Page 29 Suitable Breaker Comm. Cable PINOUT inverter Pin1 Pin2 Pin3 Pin4 CAN-H CAN-H Pin5 CAN-L CAN-L Pin6 Pin7 Pin8 Figure 9: Pylontech batteries with Solis inverter connection diagram Page 29 Contact SegenSolar (PTY) Ltd | e: info@segensolar.co.za | t: 08780 20663...
  • Page 30 Configuration-Solis 3. Enter Password 1. Press Enter to 2. Select “Advanced 4. Select “Battery Menu Settings” Control” “0010” 6. Select “Pylon” 5. Select “Battery 7. Set Over-discharge 8. Set Force-charge Select” Page 30 Contact SegenSolar (PTY) Ltd | e: info@segensolar.co.za | t: 08780 20663...
  • Page 31 Note that the last BMS’s terminal resistance must set in “1” (X=1) Comm. Cable PINOUT inverter Pin1 Pin2 Pin3 Pin4 CAN-H CAN-H-A Pin5 CAN-L CAN-L-A Pin6 Pin7 Pin8 Figure 10: Pylontech batteries with Atess inverter connection diagram Page 31 Contact SegenSolar (PTY) Ltd | e: info@segensolar.co.za | t: 08780 20663...
  • Page 32: Parameters Configuration

    Parameters Configuration 2. Enter the password “1234” to start settings. 1.Connect cables, turn on power switch. 3. Click “Protect Parameter”, change the parameters Page 32 Contact SegenSolar (PTY) Ltd | e: info@segensolar.co.za | t: 08780 20663...
  • Page 33 Parameters Configuration 4. Change the parameters according to the application Page 33 Contact SegenSolar (PTY) Ltd | e: info@segensolar.co.za | t: 08780 20663...
  • Page 34 Parameters Configuration 5. If you are applying “Peak shaving” mode, please change the Peak, Valley and Flat time. Page 34 Contact SegenSolar (PTY) Ltd | e: info@segensolar.co.za | t: 08780 20663...
  • Page 35 Function & Mode Configuration 6. Click “ Sample Calibration” window to start function configuration. All the parameters depends on the system composition. Page 35 Contact SegenSolar (PTY) Ltd | e: info@segensolar.co.za | t: 08780 20663...
  • Page 36 Function & Mode Configuration 7. Mode selection depends on the customer’s requirements. Page 36 Contact SegenSolar (PTY) Ltd | e: info@segensolar.co.za | t: 08780 20663...
  • Page 37 Configuration- Atess Necessary Parameters Setting value SOC upper limit SOC lower limit Discharge cut-off SOC Battery group Depends Battery cell number 15 x battery number Battery capacity Battery charging overcurrent protection Battery discharging overcurrent protection Float charge voltage setting 3.550 Battery undervoltage warning 3.050 Battery undervoltage protect...
  • Page 38 Comm. Cable PINOUT Suitable Breaker RS485 inverter Pin1 Pin2 Pin3 Pin4 485B Pin5 485A Pin6 Pin7 485A Pin8 485B Figure 11: Pylontech batteries with BME inverter connection diagram Page 38 Contact SegenSolar (PTY) Ltd | e: info@segensolar.co.za | t: 08780 20663...
  • Page 39 Configuration – BME Battery Setting Page 1/3:Charge Current Max: 37A Float Voltage: 53.25 x n (n=battery number) V CV Voltage: 53.25 x n V Page 2/3:Grid Available Max Bat Discharge: 37A Grid Available Bat Discharge Off: 43.5 x n V Bat Re-dischg: 48.75 x n V Page 3/3:Grid unavailable Bat Discharge Off: 43.5 x n V...
  • Page 40: Troubleshooting

    TROUBLE SHOOTING Page 40 Contact SegenSolar (PTY) Ltd | e: info@segensolar.co.za | t: 08780 20663...
  • Page 41 BatteryView to clear the BMS error. At present, the complex technical training is only open to SegenSolar SA. Should you experience any technical issues, please contact Segensolar for assistance. Pylontech share the most advanced product knowledge with them. Page 41...
  • Page 42: Reference List

    Reference list [1] Pylon Technologies Co., Ltd. High Voltage Energy Storage System Datasheet. [2] Pylon Technologies Co., Ltd. LFP Lithium Ion Energy Storage System PowerCube-H1/H2 Operation Manual. Version:EU20PIHV1001. Page 42 Contact SegenSolar (PTY) Ltd | e: info@segensolar.co.za | t: 08780 20663...
  • Page 43 Thank you To recap on todays' webinar please visit our portal Page 43 Contact SegenSolar (PTY) Ltd | e: info@segensolar.co.za | t: 08780 20663...