Annex 1: Installation And System Power On Process List - Pylontech Force-H3 Operation Manual

Lithium phosphate energy storage system
Table of Contents

Advertisement

Annex 1: Installation and System Power On Process List

Tick after
No
completion
.
1
2
3
4
5
6
7
8
9
10
11
The environment is meets all technical
requirements.
3.3.1
Cleaning
3.3.2
Temperature
3.3.3
Fire-extinguisher System
3.3.4
Grounding System
3.3.5
Clearance
Selection of installation sites.
Battery base is installed follow the technical
requirements.
Battery modules installation.
Battery system are fixed.
Control Module (BMS) and Battery Module are
installed well.
Connect D+ and D- between BMS to the
inverter/PCS or confluence cabinet.
Connect the grounding cable.
Double check all the power cables,
communication cables, grounding cable are
installed well.
Switch the external power or inverter/PCS on,
ensure all the power equipment can work
normally.
The first installation should do full charging
progress automatically.
If the status LED of BMS turns to blue, it means
this battery string is in operation.
Item
55
Remark
Refer to section 3.3
Refer to section 3.4.3.
Refer to section
3.4.5.
Refer to section
3.4.6.
Refer to section 3.4.7.
Refer to section
3.4.7.
Refer to section
3.5.3.1.
Refer to section
3.5.1.
Refer to section
3.5.1,3.5.2 and 3.5.3.
Refer to section 4.1.

Advertisement

Table of Contents
loading

Table of Contents