Annex 3: Installation and System Turn ON Progress List
Tick after
No.
completion
☐
1
☐
2
☐
3
☐
4
☐
5
☐
6
☐
7
☐
8
☐
9
☐
10
☐
11
☐
13
☐
14
The environment is meeting all technical requirements.
3.3.1
Cleaning
3.3.2
Temperature
3.3.3
Radiating System
3.3.4
Heating System
3.3.5
Fire-extinguisher System
3.3.6
Grounding System
Battery
rack
is
requirements.
Control Module (BMS) and Battery Module are installed
well. And install the rack metal strip.
The MBMS are installed well. (If configured.)
The Ethernet Switch is installed well. (If configured.)
Connect the AC power cables from BMS, MBMS and
Ethernet Switch to the AC "OUT PUT" socket of the UPS.
(If configured.)
Connect External Power Cable +/- between each BMS
to the PCS or confluence cabinet.
Connect power cables of each battery string.
Connect communication cables of each battery string.
Set up ADD switch of every BMS and the MBMS (Address
Assignment).
Connect external communication cables from BMS to
Ethernet Switch, MBMS or another
Connect the communication cable from MBMS to the
PCS.
Double check every power cables, communication
cables installed well. And ADD Switches are setting right.
Item
installed
follow
the
48
Remark
Refer to chapter
3.3
technical
Refer to chapter
3.5.3.
Refer to chapter
3.5.4.
Refer to chapter
3.5.5.
Refer to chapter
3.5.6.
Refer to chapter
3.6.2.1 or 3.6.2.2.
Refer to chapter
3.6.2.1 or 3.6.2.2.
Refer to chapter
3.6.2.1 or 3.6.2.2.
Refer to chapter
3.6.2.1 or 3.6.2.2.
Refer to chapter
3.6.3.
Refer to chapter
3.6.2.1 or 3.6.2.2.
Refer to chapter
3.6.2.1 or 3.6.2.2.
Refer to chapter
3.6.2.1 or 3.6.2.2
and 3.6.3.