Annex 1: Installation And System Turn On Progress List - Pylontech Force-H2-V2 Manual

Lithium phosphate energy storage system
Table of Contents

Advertisement

Annex 1: Installation and System Turn ON Progress List

Tick after
No.
completion
1
2
3
4
5
6
7
8
9
10
11
The environment is meeting all technical
requirements.
3.3.1
Cleaning
3.3.2
Temperature
3.3.3
Fire-extinguisher System
3.3.4
Grounding System
3.3.5
Clearance
Selection of installation sites.
Battery base is installed follow the technical
requirements.
Battery modules installation.
Battery system are fixed.
Control Module (BMS) and Battery Module are
installed well.
Connect D+ and D- between BMS to the
inverter/PCS or confluence cabinet.
Connect the grounding cable.
Double check every power cables,
communication cables, grounding cable
installed well.
Switch the external power or inverter/PCS on,
ensure all the power equipment can work
normally.
The first installation should do full charging
progress automatically.
If the status LED of BMS turns to blue, it means
this battery string is operation.
Item
45
Remark
Refer to chapter
3.3
Refer to chapter
3.4.3.
Refer to chapter
3.4.4.
Refer to chapter
3.4.5.
Refer to chapter
3.4.6.
Refer to chapter
3.4.7.
Refer to chapter
3.5.2.
Refer to chapter
3.5.1.
Refer to chapter
3.5.2 and 3.5.1.
Refer to chapter
3.6.4.