Annex 1: Installation And System Turn On Progress List - Pylontech Force-H1-V2 Operation Manual

Lithium-ion phosphate energy storage system
Table of Contents

Advertisement

Annex 1: Installation and System Turn ON Progress List

Tick after
No
completion
1
2
3
4
5
6
7
8
9
10
11
.
The environment is meeting all technical requirements.
3.3.1
Cleaning
3.3.2
Temperature
3.3.3
Fire-extinguisher System
3.3.4
Grounding System
3.3.5
Clearance
Selection of installation sites.
Battery base is installed follow the technical
requirements.
Battery modules installation.
Battery system are fixed.
Control Module (BMS) and Battery Module are
installed well.
Connect D+ and D- between BMS to the inverter/PCS
or confluence cabinet.
Connect the grounding cable.
Double check every power cables, communication
cables, grounding cable installed well.
Switch the external power or inverter/PCS on, ensure
all the power equipment can work normally.
The first installation should do full charging progress
automatically.
If the status LED of BMS turns to blue, it means this
battery string is operation.
Item
47
Remark
Refer to chapter
3.3
Refer to chapter
3.4.3.
Refer to chapter
3.4.4.
Refer to chapter
3.4.5.
Refer to chapter
3.4.6.
Refer to chapter
3.4.7.
Refer to chapter
3.5.2.
Refer to chapter
3.5.1.
Refer to chapter
3.5.2 and 3.5.1.
Refer to chapter
3.6.4.

Advertisement

Table of Contents
loading

Table of Contents