Prerequisites; Required Tools And Equipment; Steps - Cisco SRS Series Installation Manual

Cisco crs routers 16-slot line card chassis
Table of Contents

Advertisement

Installing and Removing Line Cards, PLIMs, and Associated Components
Figure 90: Cable Management Bracket

Prerequisites

Before performing this task, open the cosmetic doors (if installed) and be sure that there are no cables impeding
your access to the area of the chassis on which you wish to install the bracket.

Required Tools and Equipment

• ESD-preventive wrist strap
• Medium Phillips screwdriver
• Cable management bracket (800-23374-03)

Steps

To install a cable management bracket, follow these steps:
SUMMARY STEPS
1. Attach the ESD-preventive wrist strap to your wrist and connect its leash to one of the ESD connection
sockets on the chassis or a bare metal surface on the chassis.
2. Position the cable management bracket on the chassis.
3. Insert and tighten the screws to secure the bracket to the chassis.
DETAILED STEPS
Step 1
Attach the ESD-preventive wrist strap to your wrist and connect its leash to one of the ESD connection sockets on the
chassis or a bare metal surface on the chassis.
Step 2
Position the cable management bracket on the chassis.
Step 3
Insert and tighten the screws to secure the bracket to the chassis.
What to do next
Use the cable management bracket to organize the cables.
Cisco CRS Routers 16-Slot Line Card Chassis Installation Guide
Prerequisites
167

Advertisement

Table of Contents
loading

This manual is also suitable for:

Crs-16-lcc/mCrs-16lcc140/mCrs-16/s

Table of Contents