Chapter 2 Installation; Lifting; Unpacking And Inspection - Thermo Scientific 410i Instruction Manual

Table of Contents

Advertisement

Unpacking and
Inspection
Thermo Fisher Scientific
Chapter 2
Installation
Installation of the Model 410i includes lifting the instrument, unpacking
and inspection, connecting sample, zero, span, and exhaust lines, and
attaching the analog and/or digital outputs to a recording device. The
installation should always be followed by instrument calibration as
described in the "Calibration" chapter of this manual.
Installing the Model 410i includes the following recommendations and
procedures:
"Lifting" on page
"Unpacking and
"Setup
"Connecting External
"Startup" on page

Lifting

When lifting the instrument, use procedure appropriate to lifting a heavy
object, such as bending at the knees while keeping your back straight and
upright. Grasp the instrument at the bottom in the front and at the rear of
the unit. Although one person can lift the unit, it is desirable to have two
persons lifting, one by grasping the bottom in the front and the other by
grasping the bottom in the rear.
Equipment Damage Do not attempt to lift the instrument by the cover or
other external fittings.
The Model 410i is shipped complete in one container. If there is obvious
damage to the shipping container when you receive the instrument, notify
the carrier immediately and hold for inspection. The carrier is responsible
for any damage incurred during shipment.
Use the following procedure to unpack and inspect the instrument.
1. Remove the instrument from the shipping container and set it on a
table or bench that allows easy access to both the front and rear.
2-1
Inspection" on page
Procedure" on page
2-3
Devices" on page
2-10
2-1
2-5
Model 410i Instruction Manual
2-1

Advertisement

Table of Contents
loading

Table of Contents