2
Setting Up
Installing Your Multibath System
Stage 3: Installing the Tubing Cassette
1 Put the tubing cassette on the pressure-wheel assembly by placing the
Figure 25
2 Press the cassette down to lock the right side onto the locking-bar.
Figure 26
More detailed information on using the pump can be found in
"Using the Peristaltic Pumps 1VS and 8VS".
64
cassette on the mounting pivot, see
Placing Tubing-Cassette
Tubing-Cassette in Position
Agilent 8453 Dissolution Testing System Installing and Operating Manual
Figure
25).
!
Chapter
3,