www.agilent.com
In This Book
his handbook provides you with instructions
for installing your Agilent dissolution testing
system. This handbook has five chapters.
•
Chapter
1, "Site Requirements" — This
chapter describes the site requirements
and contains the specifications for all
units applied.
•
Chapter
2, "Setting Up" — How to set up
your Agilent 8453 UV-visible spectroscopy
system and dissolution sampling system.
•
Chapter
3, "Using the Peristaltic Pumps
1VS and 8VS" — How to install, operate,
maintain and service the peristaltic
pumps.
•
Chapter
4, "Using the Valve Unit and
Valve-pump Controller" — How to install,
operate, maintain and service the valve
unit and valve-pump controller.
•
Chapter
5, "Parts for Dissolution
Testing" — Lists of parts and their
numbers you need for the different
configurations of dissolution testing
systems.
©
Agilent Technologies 2004, 2008
Printed in Germany
09/2008
*G1127-90003*
*G1127-90003*
G1127-90003
Agilent Technologies