2
Setting Up
Installing a Valve-based Sampling System
Installing Your Peristaltic Pump 1VS
Each peristaltic pump 1VS is identified by a serial number on a label at the
rear. Write down the serial number of your pump here:
_____________________________________________________________________
Installing the pump comprises three stages:
•
•
•
Stage 1: Installing the Cables
The voltage selector and cable connectors are at the rear panel.
Make sure line-power cord is disconnected before changing line-voltage setting.
WA R N I N G
1 Set the correct voltage option (115 V or 230 V) for operation from your line
2 Check the correct fuse is installed.
3 Push connector of power cord into line-power socket.
4 Push connector of the controller-pump cable (part number G1103-61612)
5 You connect the peristaltic pump to the valve-pump controller (use
6 Set the flow control to 60 for a flow rate of about 8.5 ml/min.
46
"Stage 1: Installing the Cables"
"Stage 2: Installing the Pump Tubing"
"Stage 3: Installing the Tubing Cassette"
power supply.
into the remote control connector on the rear of the pump. When this cable
is connected, the control switch on the front panel does not function. This
prevents you using the pump manually during automatic operation.
connector marked pump 1) with the controller-pump cable (part number
G1103-61612).
Agilent 8453 Dissolution Testing System Installing and Operating Manual
on page 46,
on page 47, and
on page 47.