2
Setting Up
Installing Your Multibath System
To install the multibath sampling system for two baths (G1129A) you will need
the following parts:
• Multicell transport
• Flow cell, 1 mm path length (2)
• Valve-pump controller
• Eight-port valve unit (2)
• Peristaltic pump 1VS (2)
• Controller–GPIO cable
• Controller-–valve cable (2)
• Controller–pump cable (2)
• Dissolution probe kit (2)
• Valve tubing kit (2)
• Pump tubing (2)
• Filter tips (2)
Installing Your Multicell Transport
For details, see Installing and Operating Your Eight-position Multicell
Transport manual.
54
Agilent 8453 Dissolution Testing System Installing and Operating Manual