2
Setting Up
Installing Your Multibath System
Installing Your Peristaltic Pump 1VS
Each peristaltic pump 1VS is identified by a serial number on a label at the
rear. Write down the serial numbers of your pumps here:
1.)__________________________________________________________________
2.)__________________________________________________________________
3.)__________________________________________________________________
4.)__________________________________________________________________
Installing each pump comprises three stages:
•
•
•
Stage 1: Installing the Cables
The voltage selector and cable connectors are at the rear panel.
Make sure line-power cord is disconnected before changing line-voltage setting.
WA R N I N G
1 Set the correct voltage option (115 V or 230 V) for operation from your line
2 Check the correct fuse is installed.
3 Push connector of power cord into line-power socket.
62
"Stage 1: Installing the Cables"
"Stage 2: Installing the Pump Tubing"
"Stage 3: Installing the Tubing Cassette"
power supply.
Agilent 8453 Dissolution Testing System Installing and Operating Manual
on page 62,
on page 63, and
on page 64.