Installing Your Peristaltic Pump 1Vs - Agilent Technologies 8453 User Manual, Installing And Operating Manual

Dissolution testing system
Hide thumbs Also See for 8453:
Table of Contents

Advertisement

2
Setting Up
Installing Your Multibath System

Installing Your Peristaltic Pump 1VS

Each peristaltic pump 1VS is identified by a serial number on a label at the
rear. Write down the serial numbers of your pumps here:
1.)__________________________________________________________________
2.)__________________________________________________________________
3.)__________________________________________________________________
4.)__________________________________________________________________
Installing each pump comprises three stages:
Stage 1: Installing the Cables
The voltage selector and cable connectors are at the rear panel.
Make sure line-power cord is disconnected before changing line-voltage setting.
WA R N I N G
1 Set the correct voltage option (115 V or 230 V) for operation from your line
2 Check the correct fuse is installed.
3 Push connector of power cord into line-power socket.
62
"Stage 1: Installing the Cables"
"Stage 2: Installing the Pump Tubing"
"Stage 3: Installing the Tubing Cassette"
power supply.
Agilent 8453 Dissolution Testing System Installing and Operating Manual
on page 62,
on page 63, and
on page 64.

Advertisement

Table of Contents
loading

Table of Contents