Installing Your Eight-Position Multicell Transport; Installing Your Peristaltic Pump 8Vs - Agilent Technologies 8453 User Manual, Installing And Operating Manual

Dissolution testing system
Hide thumbs Also See for 8453:
Table of Contents

Advertisement

2
Setting Up
Installing a Multicell-transport-based Sampling System
Position 1 is at the left side of the multicell transport.
N O T E
Position 8 is at the right side of the multicell transport.

Installing Your Eight-position Multicell Transport

To install your eight-position multicell transport in the Agilent 8453
spectrophotometer, refer to your Multicell Transport for Agilent 8453
UV-visible Spectrophotometer Operator's Manual.

Installing Your Peristaltic Pump 8VS

Each peristaltic pump 8VS is identified by a serial number on a label at the
rear. Write down the serial number of your pump here:
_____________________________________________________________________
Installing the pump comprises three stages:
Stage 1: Installing the Cables
The voltage selector and cable connectors are at the rear panel.
Make sure line-power cord is disconnected before changing line-voltage setting.
WA R N I N G
1 Set the correct voltage option (115 V or 230 V) for operation from your line
2 Check the correct fuse is installed.
3 Push connector of power cord into line-power socket.
28
"Stage 1: Installing the Cables"
"Stage 2: Installing the Pump Tubing"
"Stage 3: Installing the Tubing Cassette"
power supply.
Agilent 8453 Dissolution Testing System Installing and Operating Manual
on page 28,
on page 29, and
on page 30.

Advertisement

Table of Contents
loading

Table of Contents