Provisional Burner Operation; Connecting An Ac Burner - Viessmann Vitotronic 200 Installation And Service Instructions For Contractors

Weather-compensated control unit
Table of Contents

Advertisement

Electrical connections
Connecting external safety equipment
Note
With multiple safety devices, the plug-in adaptor for
external safety equipment (accessories) can also be
connected: See chapter "Plug-in adaptor for external
safety equipment"

Provisional burner operation

Connection at plug
.
aBÖ
EIN
EIN
STB
N
STB
TR
TR
A
Fig. 22
Jumper "TR"
"ON/TR"
A

Connecting an AC burner

Pressure-jet oil/gas burner
The burner cables are included in the standard boiler
delivery.
Connect burner to DIN 4791.
Max. power consumption 6 (3) A
32
(cont.)
Insert jumper "TR"
The boiler heats up with burner stage 1 or with the
lower heating output/base load. Shutdown takes place
via the temperature controller.
"ON/TR" across "TR"
"ON".

Advertisement

Table of Contents
loading

This manual is also suitable for:

Co1e

Table of Contents