Communication via DTM with C2-master

Operation of the IO-Link master for testing purpose (without PLC)

If, for example for testing purpose, the IO-Link master is operated without PLC which means,
only via C2-master, then the IO-Link DTM allows to define the process data widths for the IO-
Link master as well as for the connected devices.
Figure 37:
Set IO-configura-
tion
D301171 - IO-Link master 1108
Note
The IO-Link master must not be in cyclic data exchange with a PLC. If necessary,
please disconnect the PLC from the fieldbus in order to be able to write the IO-con-
figuration into the master.