VERTICAL INLINE POWER FLUE TERMINATIONS
FLEX PIPE
19. Slide the finished length up towards the flashing ensuring the length of pipe is a
minimum of 609 mm measured from the top of the roof. Level the chimney and secure
using the roof support provided with kit to bottom side of the roof as shown using a
minimum of 2 screws per side- see Diagram 3b. See Diagram 4 for roof pitch and
height requirements. See Diagram 3a for securing method if 609 mm is insufficient
and additional lengths are required, this may be purchased separately. See Simpson
Duravent components list in the instruction manual for part numbers.
Termination Cap
Storm Collar
Flashing
Roof Support / Brace
Ceiling Firestop
Inner Pipe Adaptor (shown inside flex pipe)
Inline Power Flue Terminal
Ceiling Firestop
Flex Pipe
Support to prevent sagging
46
Diagram 3
Termination Cap
Storm Collar
Flashing
Roof Support
Ceiling Firestop
Enclosure
Ceiling Firestop
Elbow Support
Flex Pipe
Inline Power Flue Terminal
Diagram 3a
Note: Flex pipe is approved for up to 12 meter using one 6 meter flex kit (part
# 946-755) and one 6 meter flex kit extension (part # 946-756).
Flashings are not included in the flex kit (part #946-755).
1
946-755 Vertical Flex Kit (sold separately) includes: 6m Flex Pipe with 10
spacers (inner & outer pipe), 3 Wall Straps, Ceiling Firestop, Roof Brace,
Flex to Rigid Adaptor, Roof Support/Brace, 0.91m Rigid Duravent Pipe,
Storm Collar, High Wind Termination Cap, Hardware .
1
Max. 946-756 6m Flex kit extension (sold separately).
Diagram 3b
Roof Pitch
flat to 30.26
over 30.26
over 33.69
over 36.37
over 39.81
over 42.51
over 45.00
over 49.40
over 53.13
over 56.31
over 59.04
20. Put a bead of caulking on the exterior between the outer pipe and
flashing to prevent water from penetrating the chimney system.
21. Slide storm collar over pipe length until it reaches the flashing.
22. Install termination cap by twist locking it.
23. Secure the flashing to the roof using screws
Note: Any closets or storage spaces which the flue passes through
must be enclosed.
Termination Cap
Storm Collar
Flashing
Roof support
Diagram 4
Minimum Flue Height
Ceiling firestop
Meters
Enclosure
0.61
o
to 33.69
0.61
o
o
to 36.37
0.61
o
o
Ceiling firestop
to 39.81
0.76
o
o
to 42.51
0.99
o
o
to 45.00
1.22
o
o
to 49.40
1.52
o
o
to 53.13
1.83
o
o
to 56.31
2.13
o
o
to 59.04
2.29
o
o
to 60.26
2.44
o
o
Regency GF950L-2 Gas Fireplace

Advertisement

Table of Contents
loading

Table of Contents