VERTICAL TERMINATION (NON POWER FLUE)
102 MM X 168 MM FLUEING - VERTICAL FLEX FLUE KIT (946-768)
VERTICAL TERMINATION
When using vertical flex kit (Part #946-768), if the overall length of this vertical flex kit is too short an additional 6m flex kit extension (sold separately) is
available (part #946-756).
102 MM X 168 MM VENTING - VERTICAL FLEX VENT KIT (946-768)
1.
Maintain the 51 mm clearance (air space) to combustibles when
passing through ceilings, walls, floors, enclosures, attic rafters or
other nearby combustibles. Do not pack air spaces with insulation.
Check Venting sections for the maximum vertical rise of the venting
system and the maximum horizontal offset limitations.
Ensure that you maintain clearances around enclosures, walls, below
or above floors, floor joists, etc. Each appliance has different clearance
requirements (top,sides,bottom). See specific appliance manual for details.
2.
Set the appliance in its desired position. Drop a plumb bob down from
the ceiling/floor joist to the position of the appliance flue exit and mark
the location where the vent will penetrate the ceiling. Drill a small hole
at this point. Next drop a plumb bob from the roof to the hole previously
drilled at the ceiling level and mark the spot where the vent will penetrate
the roof.
3.
Cut a hole in the roof centered on the small hole placed in the roof in
the previous steps. The hole should be a minimum of 260 mm. The
hole may be round and or square.
4. Slip the flashing under the shingles and line up flashing so it is centered
to the hole (shingles should overlap half of the flashing) as per Diagram
1.
5. A ceiling firestop/firestop spacer must be installed when passing through
each floor or ceiling level. To install the ceiling firestop/firestop spacer in
a flat ceiling or floor joist cut a 260 mm square hole. Frame the hole as
show in Diagram 1 and install the ceiling firestop. Slide the top attic
insulation spacer onto the top of the attic insulation shield/firestop -See
Diagram 1a. Secure with 4 screws/nails. If more than one is required,
these can be purchased separately.
Note: The ceiling firestop/firestop spacer may be cut down to size if this
shield is too high for the application.
Diagram 2
-1/4
60
Ceiling firestop
6. Determine the overall height of the chimney from the top of the appliance
to the underside of the flashing. If required cut the flexible inner and outer
pipe to the desired length up to a maximum of 6.1 m.
7. Put a bead of Mill-Pac around the 102 mm collar on the appliance and
slide the inner flex pipe over the inner collar of the appliance and
secure with a minimum of 3 screws.
8. Install 102 mm spacers around 102 mm flex.
9. Repeat Step 7 to install the outer pipe to the outer collar of the appliance
Note: If an offset is necessary in the attic or floor joists it is important to
support the vent pipe every 0.91 mto avoid excessive stress and
sagging of the vent pipe. Wall straps are provided (3 in total) for
this purpose. All round/plumbers strapping may also be used if
further supports are required.
10. Attach the rigid pipe section to the adaptor by using Mill-Pac on the inner/
outer pipe. Use 3 screws to secure outer pipe.
Regency GF950L-2 Gas Fireplace
919-695
Diagram 1: The upper half of the flashing is
installed under the roofing material and not
nailed down until the chimney is installed.
This allows for small adjustments.
Diagram 1
Termination Cap
Storm Collar
Flashing
Firestop spacer to prevent
debris from falling into the
Roof support
ceiling firestop
Ceiling firestop
Enclosure
Diagram 2a
Ceiling firestop
11. Secure inner flex pipe to pipe adaptor by using Mill-Pac over the adaptor.
Slide the inner pipe over adaptor and secure with 3 screws.
12. Repeat Step 11 to secure outer flex.
13. Slide the finished length up towards the flashing ensuring the length of
pipe is a minimum of 0,61 m measured from the top of the roof. Level
the chimney and secure using the roof support provided with kit to
bottom side of the roof as shown using a minimum of 2 screws per side-
see Diagram 3b. See Diagram 4 for roof pitch and height requirements.
See Diagram 3a for securing method if 0,61 m is insufficient and
additional lengths are required, this may be purchased separately. See
Simpson Duravent components list in the instruction manual for part
numbers.
Termination Cap
Termination Cap
Storm Collar
Flashing
Roof Support / Brace
Ceiling Firestop
Ceiling Firestop
Flex Pipe
Diagram 3
Termination Cap
Storm Collar
Flashing
Roof support
Diagram 3b
Roof Pitch
Minimum Vent Height
Ceiling firestop
flat to 30.26
o
over 30.26
o
to 33.69
o
Enclosure
over 33.69
to 36.37
o
o
over 36.37
o
to 39.81
o
over 39.81
to 42.51
o
o
Ceiling firestop
over 42.51
o
to 45.00
o
over 45.00
to 49.40
o
o
over 49.40
to 53.13
o
o
over 53.13
o
to 56.31
o
over 56.31
to 59.04
o
o
over 59.04
o
to 60.26
o
14. Put a bead of caulking on the exterior between the outer pipe and flashing
to prevent water from penetrating the chimney system.
15. Slide storm collar over pipe length until it reaches the flashing.
16. Install termination cap by twist locking it.
17. Secure the flashing to the roof using screws
Note: Any closets or storage spaces which the vent passes through must
be enclosed.
1
installation
Storm Collar
Flashing
Roof Support
Ceiling Firestop
Enclosure
Ceiling Firestop
Elbow Support
Flex Pipe
Support to prevent sagging
Diagram 3a
Diagram 4
Meters
0.61
0.61
0.61
0.76
0.99
1.22
1.52
1.83
2.13
2.29
2.44
08.10.16
33

Advertisement

Table of Contents
loading

Table of Contents