Power Flue Terminal Installation - Inline Power Flue Terminations - Regency Fireplace Products Greenfire GF950L Owners & Installation Manual

Hide thumbs Also See for Greenfire GF950L:
Table of Contents

Advertisement

POWER FLUE TERMINAL INSTALLATION - INLINE POWER FLUE TERMINATIONS

Power Vent Terminal Installation
IMPORTANT: Pressure switch must always be oriented vertically inside the inline power vent.
IMPORTANT: The longer silicone tube is connected to the pressure switch side labelled "P" and the shorter silicone tube is connected to the side
labelled "V".
Pressure switch
side "P"
To rotate the pressure switch in a horizontal position, follow the steps below:
1.
Remove the 2 screws connecting the pressure switch mount to the mounting bracket.
2.
Turn the mounting bracket 90 degrees, line up the holes and screw the bracket back onto the mount.
920-210
Regency GF950L-2 Gas Fireplace
Inline Power Vent Vertical or Hortizontal Installation Instructions
Pressure switch
side "V"
flue.
Pressure switch installed
9
CV72EPV / CB72EPV
installation
04.01.20
53

Advertisement

Table of Contents
loading

Table of Contents