GF900
installation
SCREEN & INNER DOOR FRAME INSTALLATION
SCREEN & INNER DOOR FRAME INSTALLATION
1. Hang Screen Mesh over Inner Door Frame as shown in Diagram 1.
3. Install Screen and Inner Door Frame to unit over glass door frame as
shown in Diagram 3. Lower gently once in position over glass door frame.
Diagram 1
2. Bend Tab on Screen Mesh to 90º as shown in Diagram 2. Secure to
Diagram 3
Inner Door Frame with one (1) screw as shown in Diagram 2a.
Diagram 2
Diagram 2a
Regency GF950L-2 Gas Fireplace
1
11/13/15
74
919-220