Weinmann MEDUMAT Basic Servicing And Repair Instructions page 30

Ventilators
Table of Contents

Advertisement

10. Replace the alarm signalling device (see
"6.10 Replacing the alarm signalling device"
on page 27).
11. Place the new circuit board
brackets. The points of the spacer brackets
snap into the circuit board.
Make sure that no leads are beneath the circuit
board, where they may be pinched.
12. Secure the circuit board with the two short
screws
.
41
52
onto the sensor
47
cure it there with a cable tie.
15. Push the connectors
nector
in the Basic p) onto the contacts of
X3
the circuit board.
16. Connect the connector
circuit board and insert the battery
holder. Avoid pinching the battery cables.
17. Place the flat cable into the locking device
To do so, pull the upper part of the locking
mechanism upwards, slide the cable into it,
and press the upper part down again.
18. Perform calibration (see "6.9 Calibration after
and/or pneumatic block" on page 25).
30
Repair information and repair instructions
onto the spacer
22
.
B2
and se-
B1
,
,
(and also con-
X2
X5
X4
of the battery to the
X1
into the
19
X7
X7
X2
X5
:
52
X4
47
X3
X1
19

Advertisement

Table of Contents
loading

This manual is also suitable for:

Medumat basic pWm 22600Wm 22650

Table of Contents