Nortel Meridian 1 Planning, Installation And Operating Instructions page 112

Hide thumbs Also See for Meridian 1:
Table of Contents

Advertisement

Chapter 11 – Installing the power supply
Figure 20
NTMW11 power cable connection
Commercial AC power connection
7
Test the ground of each system cabinet using the following
procedure.
a
Set the circuit breakers feeding the AC outlet used to power the
cabinet to OFF.
b
Connect the power line cord to the NTMW11 main cabinet power
supply.
c
Using an ohmmeter, measure the resistance from the ground pin on
the line cord to the ground receptacle on the AC outlet.
The resistance must be less than 0.25 ¾.
If the cabinets are powered from different service panels, the ground
must be traced back to the panel serving the cabinet.
d
Reset the circuit breaker once the ground connection is verified.
—————————— End of Procedure ——————————
Option 11C Compact
Planning, Installation, Fault Clearing and CCBR Guide
Page 93 of 536

Advertisement

Table of Contents
loading

This manual is also suitable for:

Option 11c compact

Table of Contents