Chapter 7- Preparing For Installation; Tools Checklist - Nortel Meridian 1 Planning, Installation And Operating Instructions

Hide thumbs Also See for Meridian 1:
Table of Contents

Advertisement

Chapter 7– Preparing for installation

Tools checklist

Option 11C Compact
Before proceeding with the installation, obtain all the tools necessary to
install the Meridian 1 Option 11C Compact.
Check the site requirements. Make sure that all the equipment has been
received, and that equipment layout and card slot assignment plans have been
prepared.
The following is a list of tools needed to install the system components:
a variety of screwdrivers
a tape measure
a level
pliers such as side cutters and longnose pliers
an ECOS 1023 POW-R-MATE or similar type test meter
appropriate cable terminating tools
a drill for drilling lead holes for screws
Planning, Installation, Fault Clearing and CCBR Guide
Page 71 of 536

Advertisement

Table of Contents
loading

This manual is also suitable for:

Option 11c compact

Table of Contents