4.14 Lifting And Tie Down; Lifting; Tie Down - JLG EC600SJ Operation And Safety Manual

Table of Contents

Advertisement

4.14 LIFTING AND TIE DOWN

Lifting

1.
Refer to the Machine Serial Number Plate, call JLG Industries,
or weigh the individual unit to find out the Gross Vehicle
Weight.
2.
Place the boom in the stowed position.
3.
Remove all loose items from the machine.
4.
Properly adjust the rigging to prevent damage to the
machine and so the machine remains level.
31215027
SECTION 4 - MACHINE OPERATION

Tie Down

WHEN TRANSPORTING THE MACHINE, THE BOOM MUST BE FULLY LOWERED INTO
THE BOOM REST.
1.
Place the boom in the stowed position.
2.
Remove all loose items from the machine.
3.
Secure the chassis and the platform using straps or chains of
adequate strength.
4-15

Advertisement

Table of Contents
loading

This manual is also suitable for:

H600sjEc600sjpH600sjp

Table of Contents