JLG EC600SJ Operation And Safety Manual page 79

Table of Contents

Advertisement

Telescoping In and Lowering the Boom
1.
Install the spool plug in the location shown and push the
control lever on the valve up.
2.
Install the handle into the hand pump and pump the handle
until the desired platform position is reached.
3.
Push the control lever down when complete. Remove the
handle from the hand pump and the spool plug from the
valve.
31215027
Lowering the Boom
O AC 03190
1.
Push the control lever on the valve up.
2.
Install the handle into the hand pump and pump the handle
until the desired platform position is reached.
3.
Push the control lever down when complete. Remove the
handle from the hand pump.
SECTION 5 - EMERGENCY PROCEDURES
O AC 03191
5-3

Advertisement

Table of Contents
loading

This manual is also suitable for:

H600sjEc600sjpH600sjp

Table of Contents