363-205-401
Issue 7, March 1997
DO ITEMS BELOW IN ORDER LISTED
29. Perform check of RT remote alarms (if not previously checked).
30.
!
CAUTION:
This test may interrupt service on working systems in an
80E-type cabinet with bulk power plant and should be done
only on initial installation of the bulk power plant.
NOTE:
This test requires a load of at least 3A (3 mV DC at PC and
PCR test points) on the bulk power plant. If at least one fully
equipped dual channel bank is installed, there will be enough
load for testing.
If this is the initial installation of an RT channel bank assembly in
an 80E-type with bulk power, test battery string for open circuit
(OPEN BAT TEST). If you have any other type of RT configura-
tion (except the 80E cabinet equipped with the ED-7C704-30 bulk
power plant equipment), or this test has been done, this test is not
required.
31. Update office records.
32. Perform End-to-End tests in 363-205-406 TOP when required.
RT Turn Up: NTP-003
Page 7 of 8
FOR DETAILS, GO TO
DLP-519
DLP-520

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the SLC 5 Series and is the answer not in the manual?

Subscribe to Our Youtube Channel

Table of Contents

Save PDF