Turn Up J1C182Pb-1 Optics Power Shelf - Lucent Technologies SLC 5 Series Manual

Carrier system
Table of Contents

Advertisement

363-205-401
Issue 7, March 1997

Turn Up J1C182PB-1 Optics Power Shelf

and Install AYB1B Optical Units
DO ITEMS BELOW IN ORDER LISTED
1.
NOTE:
This procedure assumes the following:
The outside cable pairs or fiber lines are not closed
through to the RT so that the RT is isolated from the
digital lines
The frame or 80E-type cabinet housing the RT has
been installed
The J1C182AE dual channel bank assembly has been
installed in the frame or 80E-type cabinet
The miscellaneous pair panel, optical shelves, optics
power shelf, and fan shelves have been installed in
the frame
The LICs (lightguide interconnect cables) from the RT
frame or 80E-type cabinet to the OIC (optical intercon-
nect) have been installed
The acceptance TAB procedures in this volume have
been performed.
The 80E-type cabinet, if used, supporting equipment
has been turned up using procedures in this TAB.
This procedure contains instructions concerning the installation of
the various units into the optics power shelf, optical shelves, and
for verifying that the units are operating properly.
Power Up:
Page 1 of 4
FOR DETAILS, GO TO
NTP-008

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the SLC 5 Series and is the answer not in the manual?

Subscribe to Our Youtube Channel

Table of Contents

Save PDF