Overview - Nortel CallPilot 201i Installation And Configuration Manual

Maintenance and diagnostics
Hide thumbs Also See for CallPilot 201i:
Table of Contents

Advertisement

Performing hardware maintenance and mechanical assembly

Overview

Introduction
Before you can begin component replacement, you must do the following:
Gather the tools you need.
Remove the 201i server from the switch.
Become familiar with component layout on the 201i server.
Equipment required
You need the following tools, based on the component you are replacing:
antistatic wrist strap or antistatic mat
Phillips No. 1 and No. 2 screwdrivers
tweezers
Before you begin
Shut down the server software. Then remove the server from the switch and
lay it on a static-resistant surface, with the component side facing up.
If you need to replace the entire 201i server, review "Replacing the server"
on page 121. Then review the procedures for installing the server and
conducting diagnostic tests.
118
Standard 1.0
CallPilot

Advertisement

Table of Contents
loading

Table of Contents