REMOVAL - INSTALLATION PROCEDURES

6.1.2 Shelf pre-installation

The shelf is guided by 4 transversal bearings and 4 lateral slide blocks.
Setting screws
Bearing installation procedure :
1- Install the new bearings and the new slide blocks, as installed previously.
2- Using the setting screws, ensure that the play between the slide blocks and the guide rails is nul. For
further information, see § 4-4.
lateral slide block
contact
transversal bearing
Ensure a certain thickness of the slide blocks, which is out of its housing is equal on either side. As
indicated on the drawing above, thickness 1 must be similar to thickness 2.