REMOVAL - INSTALLATION PROCEDURES
2- Lubricate all the chains (see § 3.13).
NOTE
During chains installation, ensure that two
lifting chains are separated on both sides of
the chains separator located at the bottom
and centre of the mast, and that the chains
are not twisted before installing the
equalizers.
NOTE
Once removed, use only new clevis pins,
cotter pins, and retaining rings during chains
installation.
3- Install the lifting chains in reverse order from
the removal and disassembly procedure (see §
6.3.5).
NOTE
Use "Loctite 243" to install the equalizer
brackets and the nuts securing the pulley
pins.
NOTE
Install and tighten all equalizers on the mast
sections with new locknuts.
4- Adjust the tension of the chains (refer to the
procedure for chain tension adjustment, § 4.2).
Ensure the backup cables and electrical
cables are correctly installed in the grooves
of the pulleys.
74
NOTE
TOUCAN Duo
Updated 06-2015
VI-3